2022
DOI: 10.1016/j.ijepes.2021.107672
|View full text |Cite
|
Sign up to set email alerts
|

Coordination of wind power producers with an energy storage system for the optimal participation in wholesale electricity markets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
2

Relationship

2
7

Authors

Journals

citations
Cited by 25 publications
(8 citation statements)
references
References 37 publications
0
6
0
Order By: Relevance
“…At the second stage, after the realisation of random parameters, the AG's traded power with the RT WEM, as well as upward/downward adjustment power of DGs and charge/discharge power of BSUs, are specified. It should be mentioned that, for the realisation of the existing stochastic factors in the raised decision-making process, a high number of scenarios are generated by the Monte Carlo simulation technique and reduced to an adequate number by utilising the fast backward/forward scenario reduction algorithm [20].…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…At the second stage, after the realisation of random parameters, the AG's traded power with the RT WEM, as well as upward/downward adjustment power of DGs and charge/discharge power of BSUs, are specified. It should be mentioned that, for the realisation of the existing stochastic factors in the raised decision-making process, a high number of scenarios are generated by the Monte Carlo simulation technique and reduced to an adequate number by utilising the fast backward/forward scenario reduction algorithm [20].…”
Section: Methodsmentioning
confidence: 99%
“…4. Constraints of energy storage units Mathematical models as well as operational constraints of BSUs are stated by Equations ( 12) to (18) [20]. In this regard, the charge and discharge power of these systems is limited by Equations ( 12) and ( 13), respectively.…”
Section: Constraints Of Generation Unitsmentioning
confidence: 99%
“…In the end, the nth follower's set of decision variables are listed as follows: Since problems of followers, DER AGs, are linear, continuous, and thus convex, the considered one-leader-multifollower game-based model could be reformulated to a single-level model by replacing the followers' problem with their Karush-Kuhn-Tucker (KKT) conditions [33]. In this context, KKT conditions, including the stationary, complementary slackness, and dual feasibility, are illustrated in Eqs ( 29) to (48).…”
Section: B Problem Formulation Of the Followers-der Agsmentioning
confidence: 99%
“…Nonetheless, the high penetration of renewable-based units and their intermittent behavior have caused several technical, economic, and regulatory challenges [1]. The mentioned issues could be addressed by jointly operating non-dispatchable renewable units with different types of dispatchable resources, including conventional generation units, flexible loads, and energy storage devices [2]. To facilitate the coordination of these energy sources in a single platform, a concept called virtual power plant (VPP) has been raised.…”
Section: Introductionmentioning
confidence: 99%