2014
DOI: 10.1016/j.ejor.2014.03.039
|View full text |Cite
|
Sign up to set email alerts
|

Coordination of production and interstage batch delivery with outsourced distribution

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
22
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 55 publications
(22 citation statements)
references
References 27 publications
0
22
0
Order By: Relevance
“…Safaei et al (2010) studied an integrated model with the consideration of limited vehicles in a series-structured multi-factory manufacturing system. In recent literature, some researchers studied the planning instead of detailed scheduling for the production-distribution problems (Liu and Papageorgiou, 2013;Fahimnia et al, 2013;Calvete, 2014), while others focused on the scheduling of multi-site series-structured production-distribution problems (H'Mida and Lopez, 2013;Agnetis et al, 2014). Agnetis et al (2014) considered a coordinated production and batch delivery scheduling problem.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Safaei et al (2010) studied an integrated model with the consideration of limited vehicles in a series-structured multi-factory manufacturing system. In recent literature, some researchers studied the planning instead of detailed scheduling for the production-distribution problems (Liu and Papageorgiou, 2013;Fahimnia et al, 2013;Calvete, 2014), while others focused on the scheduling of multi-site series-structured production-distribution problems (H'Mida and Lopez, 2013;Agnetis et al, 2014). Agnetis et al (2014) considered a coordinated production and batch delivery scheduling problem.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In recent literature, some researchers studied the planning instead of detailed scheduling for the production-distribution problems (Liu and Papageorgiou, 2013;Fahimnia et al, 2013;Calvete, 2014), while others focused on the scheduling of multi-site series-structured production-distribution problems (H'Mida and Lopez, 2013;Agnetis et al, 2014). Agnetis et al (2014) considered a coordinated production and batch delivery scheduling problem. A three-party logistics provider is responsible to deliver semi-finished products between factories by two transportation modes, i.e., regular transportation and express transportation.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The other kind of two-stage problem is the scheduling between the manufacturer and its customers. Agnetis, Aloulou, and Fu (2014) considered the coordination of production and interstage batch delivery using a third-party logistic (3PL) provider. Algorithms for solving the problem include approximation algorithms (Averbakh & Xue, 2007) and intelligent algorithms (Naso, Surico, Turchaiano, & Kaymak, 2007;Zegordi, Abadi, & Nia, 2007).…”
Section: Introduction and Literature Reviewmentioning
confidence: 99%
“…In distribution and delivery, as many companies are unable to provide sufficient transportation facilities to deliver the customer orders due to high costs of initial investment, transportation is outsourced to the third-party logistics (3PL) providers in many practical cases (Agnetis et al, 2014;Mehri et al, 2013;Pourghahreman & Qhatari, 2015;Rahchamandi & Fallahi, 2014). Aguezzoul (2014) presented a review on 3PL studies.…”
Section: Introductionmentioning
confidence: 99%