Construction projects planning using network model with the fuzzy decision node

Abstract: In the construction practice, at the stage of planning of a construction project, planners are trying to take into account the possibility of unfavorable situations and their consequences during the project execution. Therefore, planning decisions should use appropriate tools for uncertainty modeling as well as consider alternative options for the implementation of the entire undertaking or the most sensitive (critical) works. Taking into account the fact that the management and planning of construction projec… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
13
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(15 citation statements)
references
References 32 publications
0
13
0
Order By: Relevance
“…Therefore, the research led towards looking at the problem from this angle, which allowed the description of naturally qualitative (immeasurable) variables and the determination of existing relations between them in fuzzy set categories [15,[25][26][27][28][29][30][31][32][33][34][35][36][37][38][39]. The advantages of fuzzy theory made it possible to describe the defects, representing three middle states (II, III, IV) of conditions of the building elements' maintenance, in a clear quantitative (measurable) aspect.…”
Section: Research Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…Therefore, the research led towards looking at the problem from this angle, which allowed the description of naturally qualitative (immeasurable) variables and the determination of existing relations between them in fuzzy set categories [15,[25][26][27][28][29][30][31][32][33][34][35][36][37][38][39]. The advantages of fuzzy theory made it possible to describe the defects, representing three middle states (II, III, IV) of conditions of the building elements' maintenance, in a clear quantitative (measurable) aspect.…”
Section: Research Problemmentioning
confidence: 99%
“…A number of works by Nowogońska [16][17][18][19][20] were used in the methodical approach to the technical assessment of tenement houses, and the fuzzy calculus presented in the publications of Plebankiewicz, Wieczorek and Zima [21][22][23][24][25][26] was used in the assessment of the whole service life of a building object. The works of Ibadov [27][28][29][30] and other authors [31][32][33][34][35][36][37][38][39], which concerned the construction investment process with the fuzzy phase, allowed for the practical application of uncertain and subjective events when determining the degree of damage to the tested tenement houses.…”
Section: Introduction 1source Literaturementioning
confidence: 99%
“…The DCPM method is still being developed by Zhang et al [32] and Zhang et al [33]. Recently, Ibadov [34], Ibadov and Kulejewski [35], proposed a network model with a fuzzy decision node for planning construction projects that feature the analysis of uncertain parameters.…”
Section: Decision Network-literature Reviewmentioning
confidence: 99%
“…to increasing an intensity of a fuzzy set's contrast fuzzy theory features have been explicated in recently published papers[1, 2,3,4,5,8,9,10,11]. The intensity of the contrast ascends the membership degrees, which are equal or higher than 0,5 and descends those of them which are lower than 0,5.Zadeh function applied to increase an intensity of a fuzzy set's contrast AX: uj) -degree of defects membership μuj to elementary fuzzy sets u1yu30 frequency of occurring defects; f(μuj) -membership function at range [0,1].…”
mentioning