Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM

Abstract: Purpose The construction industry is characterized by a long construction period, high cost and many uncontrollable factors. The owners and contractors are increasingly focusing on the efficiency of their construction and costs in pursuit of greater economic benefits. However, current methods used in the construction period and cost optimization analysis with multiple constraints the have their own limitations. Therefore, this study aims to propose a combination of genetic algorithm (GA) and building informati… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(9 citation statements)
references
References 26 publications
(25 reference statements)
0
7
0
Order By: Relevance
“…GAS demonstrated a 6.68% cost reduction to the actual schedules on average. The optimisation results showed more reduction in cost than the BIM-based time-cost optimisation proposed by (He et al 2019) which reduces by 0.62% in cost. The BIM-based automatic planning method developed by (Wang and Rezazadeh Azar 2019) showed 13.27% reductions in time compared to planned activities, although costs are not evaluated.…”
Section: Discussionmentioning
confidence: 82%
“…GAS demonstrated a 6.68% cost reduction to the actual schedules on average. The optimisation results showed more reduction in cost than the BIM-based time-cost optimisation proposed by (He et al 2019) which reduces by 0.62% in cost. The BIM-based automatic planning method developed by (Wang and Rezazadeh Azar 2019) showed 13.27% reductions in time compared to planned activities, although costs are not evaluated.…”
Section: Discussionmentioning
confidence: 82%
“…Asiedu and Gyadu-Asiedu (2019) used a Bayesian Markov Chain Monte Carlo simulation model and a regression analysis model to predict construction duration overrun. He et al (2019) used 5D duration and cost optimization to develop a model based on genetic algorithm and building information modeling. The study established that this method was reasonable and effective in dealing with the complicated problem of period and cost as GA accelerated the optimization process and yielded a reliable Pareto solution.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In order to create a five-dimensional construction time-cost optimization model with the benefits of optimization and simulation, He, et al [55] integrated the BIM process with GA. Rahmani Asl, et al [56] proposed an integrated framework for BIM-based performance optimization to minimize the energy consumption while maximizing the efficient daylighting level for a residential dwellings. Sekhar and Maheswari [57] aimed to study the impact of BIM on managing and reducing change orders in off-site construction by optimizing design via visualization throughout the planning phase.…”
Section: Applications Of Building Information Modellingmentioning
confidence: 99%