Graph-Based Automated Construction Scheduling without the Use of BIM

Abstract: The construction industry has been suffering from delay and cost overrun for decades. Experienced schedulers programs and allocate contingencies (both cost and time) based on professional experiences and gained knowledge. Such tacit knowledge has not been captured, stored, and shared with inexperienced schedulers. This paper proposes a Graph-based Automated Scheduling (GAS) method to capture, store and reuse the tacit knowledge in the construction schedules. The proposed GAS method takes construction schedules… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 50 publications
0
5
0
Order By: Relevance
“…Zhu et al (2023) [16] innovatively leveraged a game engine to create a reconfigurable assembly simulator by deploying Deep Reinforced Learning for automated assembly plans using robots on robot-based construction sites. Hong et al (2023) [22] employed a Graph-Based Automated Scheduling method, rearranging construction schedules by extracting activity characteristics to maximize efficiency in terms of cost and time. Moreover, Building Information Modeling (BIM) serves as a pivotal tool for extracting intercomponent relationships and determining optimal assembly schedules, as demonstrated by Liu et al (2014) [23].…”
Section: Methodology For On-site Construction Planning Automation And...mentioning
confidence: 99%
“…Zhu et al (2023) [16] innovatively leveraged a game engine to create a reconfigurable assembly simulator by deploying Deep Reinforced Learning for automated assembly plans using robots on robot-based construction sites. Hong et al (2023) [22] employed a Graph-Based Automated Scheduling method, rearranging construction schedules by extracting activity characteristics to maximize efficiency in terms of cost and time. Moreover, Building Information Modeling (BIM) serves as a pivotal tool for extracting intercomponent relationships and determining optimal assembly schedules, as demonstrated by Liu et al (2014) [23].…”
Section: Methodology For On-site Construction Planning Automation And...mentioning
confidence: 99%
“…Several studies have used AI in coordination with 3D and 4D BIM to generate construction schedules [2,[13][14][15][16][17][18]. Kim et al [2] proposed a framework for automating schedule generation from BIM, where the sequencing rules are predefined.…”
Section: Previous Studiesmentioning
confidence: 99%
“…Kim et al [2] proposed a framework for automating schedule generation from BIM, where the sequencing rules are predefined. Hong et al [14] proposed graph-based automated scheduling (GAS) to automatically store the best practices of past projects and reuse them to generate a new project schedule. Faghihi et al [15] proposed a method for retrieving information from BIM to develop construction sequencing using a genetic algorithm (GA).…”
Section: Previous Studiesmentioning
confidence: 99%
“…However, BIM models often do not include environmental factors, temporary structures, equipment and material availability, specific construction specifications, and the methodology of the building site. Therefore, the BIM-based automatic generation of schedules requires manual intervention to be practical [25,26].…”
Section: Bim-driven Schedule Generationmentioning
confidence: 99%
“…Hong et al [26] proposed a graph-based construction scheduling approach. Their proposed approach stores past best practices and recycles the information to optimize the resource usage, task sequence, and duration of the new project.…”
Section: Machine Learning-based Schedule Generationmentioning
confidence: 99%