2020
DOI: 10.1155/2020/8832664
|View full text |Cite
|
Sign up to set email alerts
|

Constructing a Risk‐Sharing Framework for Sponge City PPP Projects from the Perspective of the Individual Participant

Abstract: Construction of sponge city PPP projects is perceived as a feasible measure for achieving the sustainable urbanization. To ensure the success of sponge city PPP projects, reasonable sharing of risks among participants, which has remained scarce and unscientific, is becoming an urgent problem to be solved. In order to enable the individual participant to accurately grasp the situation of his own risks, specifically for the individual participant, this paper constructs a risk-sharing framework for sponge city PP… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(14 citation statements)
references
References 30 publications
0
5
0
Order By: Relevance
“…Among them, the stationary tests mainly rely on the ADF unit root inspection, the white noise test is mainly to prove that the original sequence is a nonwhite noise sequence, and the residual is a white noise sequence [10].…”
Section: Box-jenkins Model Eorymentioning
confidence: 99%
“…Among them, the stationary tests mainly rely on the ADF unit root inspection, the white noise test is mainly to prove that the original sequence is a nonwhite noise sequence, and the residual is a white noise sequence [10].…”
Section: Box-jenkins Model Eorymentioning
confidence: 99%
“…According to statistics from the Ministry of Finance, the investment in SC construction is about 29 million US dollars per square kilometer. With the advancement of SC projects, it is difficult to meet the construction demand solely relying on government financial investment 10 . Specific implementation details of the construction area are given in Fig.…”
Section: Introductionmentioning
confidence: 99%
“…Although PPP mode provides an effective way to promote the construction of SC, there are potential opportunistic risks hidden in its actual operation. Compared with other projects, SC PPP projects have the characteristics of multiple participating departments, strong public welfare, and long construction period, which leads to the complexity and difficulty in controlling the project participants and is the main sticking point in promoting the further development of SC projects 10 . As the main stakeholders of SC projects, the expected results between the government and private companies are different 14 .…”
Section: Introductionmentioning
confidence: 99%
“…The weighting result of a single expert makes it difficult to avoid the contingency, not reflecting the overall opinion of the whole industry. OWA enables the integration and generalization of multiple experts' weighting results; the method assumes that the weighting results of the same indicator obey normal distribution, and the processing of group decision results ensures the integrity of weights information [64].It should be noted that the number of experts met the requirements of OWA and the Delphi method [65].…”
Section: Owa Operator Based On Stakeholdersmentioning
confidence: 99%