2019
DOI: 10.1504/ajmsa.2019.110377
|View full text |Cite
|
Sign up to set email alerts
|

Consideration of skills in assembly lines and seru production systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 0 publications
0
2
0
1
Order By: Relevance
“…Tasarladıkları çok amaçlı model ile bunun NP zor bir problem olduğunu kanıtlamışlardır. Abdullah ve Süer [29] çalışmalarında, montaj hattı ve SPS için işgücü becerilerini göz önünde bulunduran çalışmalarında, yüksek beceri seviyesinde işçilerin SPS'te çalıştırılmalarının daha iyi olduğunu ortaya koymuşlardır.…”
Section: Seru üRetim Sistemi Ve Montaj Hattı üRetim Sistemi İçin İş...unclassified
“…Tasarladıkları çok amaçlı model ile bunun NP zor bir problem olduğunu kanıtlamışlardır. Abdullah ve Süer [29] çalışmalarında, montaj hattı ve SPS için işgücü becerilerini göz önünde bulunduran çalışmalarında, yüksek beceri seviyesinde işçilerin SPS'te çalıştırılmalarının daha iyi olduğunu ortaya koymuşlardır.…”
Section: Seru üRetim Sistemi Ve Montaj Hattı üRetim Sistemi İçin İş...unclassified
“…Woo et al [34] considered unrelated parallel BLSPs with time-dependent deterioration and RMAs, proposing a GA with a random key to solve the problem. Abdullah and Süer [35] considered the decision-making on the selection of a manufacturing strategy between the classical assembly line and seru according to the skill levels of the operator. Liu et al [36] proposed exact solutions and heuristic algorithms to minimize the makespan and balance the worker's workload of divisional and rotating seru in the seru production system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Luo et al (2017) studied the seru loading problem under uncertainty, a random bi-objective model was proposed to minimize the makespan and the total tardiness penalty cost. Abdullah and S€ uer (2019) studied how worker skill levels impact the cycle time of SPS, seven skill levels have been considered for workers and the results for the impact of skill are presented. By considering inter-seru worker transfer to realize Shojinka in SPS, Yılmaz (2020a) investigated the workforce and products assigning in seru loading problem and developed a mathematical optimization model to minimize the maximum completion time of K 52,9 batches in SPS.…”
Section: Introductionmentioning
confidence: 99%