2006
DOI: 10.3846/13928619.2006.9637728
|View full text |Cite
|
Sign up to set email alerts
|

Complex Usage of 4d Information Modelling Concept for Building Design, Estimation, Sheduling and Determination of Effective Variant

Abstract: With the growth of information technologies in the field of construction industry, the concept of CAD (Computer Aided Design), which denotes just design operations using a computer acquires a new meaning and changes the contents lightening design process based on product modelling and further numerical simulation construction process and facility managing. New definitions as Building Information Modelling (BIM) and Product Lifecycle Management (PLM) are more and more usable as the definition of a new way appro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
22
0
4

Year Published

2006
2006
2018
2018

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 36 publications
(26 citation statements)
references
References 3 publications
0
22
0
4
Order By: Relevance
“…This results in the creation of better working conditions for building teams, time saving, higher quality of work and better buildings because of the informed decisions made in the process. Using of BIM ensures that the entire lifecycle of the building (design/ construction/operation) is considered [21]. All information about the building and its lifecycle, defining and simulating the building, its construction and maintenance, using the integrated tools, is included.…”
Section: Bim As An Approach To Building Design and Managementmentioning
confidence: 99%
See 4 more Smart Citations
“…This results in the creation of better working conditions for building teams, time saving, higher quality of work and better buildings because of the informed decisions made in the process. Using of BIM ensures that the entire lifecycle of the building (design/ construction/operation) is considered [21]. All information about the building and its lifecycle, defining and simulating the building, its construction and maintenance, using the integrated tools, is included.…”
Section: Bim As An Approach To Building Design and Managementmentioning
confidence: 99%
“…The complete cycle is being executed through the stages of the considered 5D concept model (Fig. 2) in order to make the best solution, while there is a continual exchange of the cycle information flow between the stages, encouraging the selection of the most effective variant [21]. Structurally, the 5D concept model is divided into levels as follows: at the first level (cells in bold), the stages and their interrelations are presented; at the second level (cells shown by a dotted line), the initial data (and procedures) are given; the third level (cells with arrows) presents the actions and processes taking place; the fourth level (big cells) shows the obtained results as well as some benefits and advantages; at the fifth level, the effectiveness criteria of the stages are obtained, which are further used for multiple criteria evaluation of the construction project alternatives.…”
Section: New Concept In Design and Constructionmentioning
confidence: 99%
See 3 more Smart Citations