2011
DOI: 10.1016/j.ijproman.2011.04.003
|View full text |Cite
|
Sign up to set email alerts
|

Comparing the value of information sharing under different inventory policies in construction supply chain

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
19
0
2

Year Published

2014
2014
2024
2024

Publication Types

Select...
5
2
2

Relationship

0
9

Authors

Journals

citations
Cited by 41 publications
(21 citation statements)
references
References 37 publications
0
19
0
2
Order By: Relevance
“…For example, at the construction site, an information platform integrated with Radio Frequency Identification or Machine Vision Technology helps stakeholders to locate equipment ( Jog et al, 2011). Between stakeholders, such as contractors and suppliers, having a linked database reduces the probability of a material shortfall (Xue et al, 2011). Such is also applicable to the OM supply chain, where the Building Automation System not only helps with the daily building management, but by linking it up with the information platforms of vendors of mechanical systems installed, response during breakdown will be more effective.…”
Section: Discussionmentioning
confidence: 99%
“…For example, at the construction site, an information platform integrated with Radio Frequency Identification or Machine Vision Technology helps stakeholders to locate equipment ( Jog et al, 2011). Between stakeholders, such as contractors and suppliers, having a linked database reduces the probability of a material shortfall (Xue et al, 2011). Such is also applicable to the OM supply chain, where the Building Automation System not only helps with the daily building management, but by linking it up with the information platforms of vendors of mechanical systems installed, response during breakdown will be more effective.…”
Section: Discussionmentioning
confidence: 99%
“…Risk measurement Value at risk (VaR) measures the largest amount of loss within a certain time period at a given confidence level [6,21,22]. For facilitating the understanding of risks and benefiting supply chain risk management, VaR is used here with a statistical confidence of 95%.…”
Section: Ementioning
confidence: 99%
“…The importance of information sharing in supply chains has been well-studied [5][6][7][8][9][10][11][12][13] and there is consensus that information sharing based on long-term cooperation and coordination is useful for the improvement of companies' competitive advantages. However, there is still a lack of information sharing within companies nowadays.…”
Section: Introductionmentioning
confidence: 99%
“…This study also reported that the potential total SC cost savings up to 9.7% have been shown, with increased savings occurring with reduced system capacity. A comparative study on the value of IS under different inventory policies in construction SC is done by Xue et al (2011).They reported that Q system is better than P system under no IS and P system is better than Q system under IS for contractor's service level. A study on the significance of vertical IS on SC performance incorporating buyer's expectations under various conditions (Karabatı and Sayın, 2008) is also reported in literature.…”
Section: Introductionmentioning
confidence: 99%