Combining Takt Planning With Prefabrication for Industrialized Construction

Abstract: Prefabrication and takt planning and control have been discussed a lot among lean construction researchers and practitioners. However, prefabrication and takt planning together as a way to promote industrialization in construction have been under explored in earlier research. Based on a literature review and two case analysis, this study explored the synergies between prefabrication and takt to promote the industrialization in construction. First case applied prefabrication and takt planning together and the s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
3
1

Relationship

4
6

Authors

Journals

citations
Cited by 13 publications
(10 citation statements)
references
References 12 publications
0
10
0
Order By: Relevance
“…Moreover, design solutions should promote the best constructability, not only the lowest cost. In addition to proactive co-creation in the design phase, the implementation of modular solutions, especially the use of modular and prefabricated, bathrooms could streamline takt production (Chauhan et al 2018). The implementation could lower the risks and increase the flow, while eliminating the second takt train and almost halving the number of work stages operated in a single apartment.…”
Section: Discussion and Recommendationsmentioning
confidence: 99%
“…Moreover, design solutions should promote the best constructability, not only the lowest cost. In addition to proactive co-creation in the design phase, the implementation of modular solutions, especially the use of modular and prefabricated, bathrooms could streamline takt production (Chauhan et al 2018). The implementation could lower the risks and increase the flow, while eliminating the second takt train and almost halving the number of work stages operated in a single apartment.…”
Section: Discussion and Recommendationsmentioning
confidence: 99%
“…Based on data visualised in Figure 5, it is apparent that the Takt implementation in the case project was not producing results or benefits reported in Dlouhy et al (2016) or Binninger et al (2018). TPTC should specifically benefit the project when prefabrication and Takt planning are combined (Chauhan et al 2018). TPTC should enhance the dialogue between participants and provide common understanding, which provides positive effects to the whole project (Dlouhy et al, 2018).…”
Section: Mobile Takt Plan and Requirement For Situation Awarenessmentioning
confidence: 93%
“…Recent advancements, e.g., in adopting takt production, have improved the processes (Lehtovaara et al 2021). However, successful takt production implementation on-site often requires simultaneous product development (Chauhan et al 2018), new organization and collaboration methods (Kujansuu et al 2019), and management of logistic processes (Tetik et al 2019a).…”
Section: Broken Processmentioning
confidence: 99%