Collaborative Tool for the Construction Site to Enhance Lean Project Delivery

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…However, focusing on productivity metrics offered by LPS and LBMS can lead to counterproductive behaviour by steering the production towards results instead of managing by means. Secondly, a major gap shows that LPS and LBMS are still lagging in supporting real-time flow monitoring, which is a challenging lack of automation, as Ratajczak et al (2017) indicated. Thus, adopting more tracking and tracing technologies, such as IoT sensors, is envisioned for autonomous data entry for BIM-based production planning and control systems (Dave et al, 2016).…”
Section: Reflection On Lps and Lbmsmentioning
confidence: 99%
“…However, focusing on productivity metrics offered by LPS and LBMS can lead to counterproductive behaviour by steering the production towards results instead of managing by means. Secondly, a major gap shows that LPS and LBMS are still lagging in supporting real-time flow monitoring, which is a challenging lack of automation, as Ratajczak et al (2017) indicated. Thus, adopting more tracking and tracing technologies, such as IoT sensors, is envisioned for autonomous data entry for BIM-based production planning and control systems (Dave et al, 2016).…”
Section: Reflection On Lps and Lbmsmentioning
confidence: 99%
“…for the control of material allowance on site. The metrics represent total project measures but can be broken down to different tiers according to Ratajczak et al (2018) if, e.g., only the performance of a particular trade is of interest. The process status of the single DOKs will be stored in the IfcTask attribute status and serves as a query parameter for the construction progress visualization in the BIM viewer.…”
Section: Control and Learningmentioning
confidence: 99%
“…Those interventions and collaborative approaches are then reviewed and established through a theoretical framework. Assad et al (2020a) and Ratajczak et al (2018) highlighted that the construction industry has unique characteristics. The scale of projects involves a large investment, multi-faceted project procurement processes, interrelated project execution processes and advancement of the innovative approaches in terms of project delivery (Deep et al, 2019).…”
mentioning
confidence: 99%