2023
DOI: 10.24928/2023/0170
|View full text |Cite
|
Sign up to set email alerts
|

A System Dynamic Modelling Approach for Integrated Lean-BIM Planning and Control Methods

Abstract: Traditional planning and control methods do not accurately reflect the construction reality and lack feedback loops. The Last Planner System (LPS) and Location-based Management System (LBMS) have been suggested as socio-technical systems to generate practical and actionable real-life data based on production theories and logic. This data can be effectively communicated, analysed, and managed using the capabilities offered by Building Information Modelling (BIM) workflows. However, a true integration between Le… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 23 publications
0
3
0
Order By: Relevance
“…The significance of the LPS and BIM is widely acknowledged in addressing the shortcomings of production planning and control [31,33,45]; however, the current policies lack validation. Accordingly, this paper assesses the stakeholders' expectations about LPS and BIM for MD mitigation strategies through a literature review, thematic analysis, and a qualitative data analysis technique (as listed in Figure 2).…”
Section: Lps-bim Mitigation Strategies For MD Practicesmentioning
confidence: 99%
See 2 more Smart Citations
“…The significance of the LPS and BIM is widely acknowledged in addressing the shortcomings of production planning and control [31,33,45]; however, the current policies lack validation. Accordingly, this paper assesses the stakeholders' expectations about LPS and BIM for MD mitigation strategies through a literature review, thematic analysis, and a qualitative data analysis technique (as listed in Figure 2).…”
Section: Lps-bim Mitigation Strategies For MD Practicesmentioning
confidence: 99%
“…The MD is located in the heart of the CLD, as shown in Figure 9, and has a critical impact on driving the B1 loop; MD depends on the number of constraints encountered and removed in the system [45]. The qualitative model was expanded to accommodate the changes in MD, constraints, and waste caused by MD initiated by schedule pressure.…”
Section: Casual Loop Diagram (Cld)mentioning
confidence: 99%
See 1 more Smart Citation