2012
DOI: 10.1007/s10836-012-5308-1
|View full text |Cite
|
Sign up to set email alerts
|

Cohesive Coverage Management: Simulation Meets Formal Methods

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2019
2019

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…V&V are key processes since 80% of product's total manufacturing cost is locked in at the conceptual design phase (Kim et al, 2015) and both V&V are related with the appraisal costs (Aleem et al, 2003). Multiple economic benefits from effective V&V can be realized from reduction of the appraisal costs (VDI, 2002), decrease of the product design costs (Hazra et al, 2012), improved product performance and reliability , identification of design flaws at an early stage (Zhou et al, 2015), decrease of the rework of a product and promotion of the most suitable Quality Management strategy (Aleem et al, 2003).…”
Section: Introductionmentioning
confidence: 99%
“…V&V are key processes since 80% of product's total manufacturing cost is locked in at the conceptual design phase (Kim et al, 2015) and both V&V are related with the appraisal costs (Aleem et al, 2003). Multiple economic benefits from effective V&V can be realized from reduction of the appraisal costs (VDI, 2002), decrease of the product design costs (Hazra et al, 2012), improved product performance and reliability , identification of design flaws at an early stage (Zhou et al, 2015), decrease of the rework of a product and promotion of the most suitable Quality Management strategy (Aleem et al, 2003).…”
Section: Introductionmentioning
confidence: 99%