Proceedings of the 2020 International Conference on Big Data in Management 2020
DOI: 10.1145/3437075.3437094
|View full text |Cite
|
Sign up to set email alerts
|

Change Readiness Assessment for the Implementation of Building Information Modeling within a Construction Project Management Company

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 15 publications
0
3
0
Order By: Relevance
“…For each object, m extent analysis values are symbolized by M̃jgi with (j=1,...,m) representing the triangular fuzzy numbers, with the membership function represented by M̃(x). Using Chang's extent analysis method (Chang, 1996) due to the simplicity of its steps in comparison with other similar approaches (Dag˘deviren, et al, 2008;Britel and Cherkaoui, 2020). The fuzzy synthetic extent value is calculated in regards to the i th object with the formula:…”
Section: Fuzzy Analytic Network Process Methodologymentioning
confidence: 99%
See 1 more Smart Citation
“…For each object, m extent analysis values are symbolized by M̃jgi with (j=1,...,m) representing the triangular fuzzy numbers, with the membership function represented by M̃(x). Using Chang's extent analysis method (Chang, 1996) due to the simplicity of its steps in comparison with other similar approaches (Dag˘deviren, et al, 2008;Britel and Cherkaoui, 2020). The fuzzy synthetic extent value is calculated in regards to the i th object with the formula:…”
Section: Fuzzy Analytic Network Process Methodologymentioning
confidence: 99%
“…Step 8: Definition of the readiness for change maturity level. According to the scale proposed by Britel and Cherkaoui (2020) in Table 4, the readiness for change maturity level (RCML) is determined based on the maturity level (ML) obtained value. It is important to note that for steps n° 2, 3 and 6, obtaining a consensus between the focus group members was necessary, therefore a two-round Delphi methodology was used.…”
Section: Maturity Model Perspectivementioning
confidence: 99%
“…Since the human element have heavily influenced the acceptance of this smart 3D model-based approach, its effective execution must guarantee the key stakeholders' preparedness for change. Britel and Cherkaoui [24] have analysed the modified readiness for the deployment of BIM inside a construction project administration organisation in Morocco. The suggested assessment system bases its analysis on linguistic parameters and the Fuzzy Analytic Hierarchy Procedure.…”
Section: Introductionmentioning
confidence: 99%