Concepts of Advanced Zero Waste Tools 2021
DOI: 10.1016/b978-0-12-822183-9.00004-0
|View full text |Cite
|
Sign up to set email alerts
|

Challenges, issues, and problems with zero-waste tools

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 21 publications
0
3
0
1
Order By: Relevance
“…We sought an idea from a professional with at least 20 years of working experience in construction management and who has participated in many construction projects in which he experienced construction first-hand information. [37,38] Time pressure [39,40] Difficulties for delivery vehicles accessing construction sites [41,42] 2 Transportation problem [43,44] Lack of supervision [45] Inefficient method of unloading [46,47] 3 Incorrect Procurement [48,49] Lack of on-site waste management plans [50,51] Insufficient protections during unloading [50,52] 4 Lack of design standards for reducing construction waste [53,54] Use of incorrect material requiring replacement [54,55] Waste resulting from cutting uneconomical shapes [56,57] 5 Low cost for construction waste disposal [58,59] Poor craftsmanship [60,61] Damage to materials on-site [62] 6…”
Section: Waste Reduction Hierarchy On 3r (Reduce Reuse and Recycle)mentioning
confidence: 99%
“…We sought an idea from a professional with at least 20 years of working experience in construction management and who has participated in many construction projects in which he experienced construction first-hand information. [37,38] Time pressure [39,40] Difficulties for delivery vehicles accessing construction sites [41,42] 2 Transportation problem [43,44] Lack of supervision [45] Inefficient method of unloading [46,47] 3 Incorrect Procurement [48,49] Lack of on-site waste management plans [50,51] Insufficient protections during unloading [50,52] 4 Lack of design standards for reducing construction waste [53,54] Use of incorrect material requiring replacement [54,55] Waste resulting from cutting uneconomical shapes [56,57] 5 Low cost for construction waste disposal [58,59] Poor craftsmanship [60,61] Damage to materials on-site [62] 6…”
Section: Waste Reduction Hierarchy On 3r (Reduce Reuse and Recycle)mentioning
confidence: 99%
“…Now it is high time to talk about effectively using waste and disposal. Industrial waste is a substance that can't be practiced for further production after manufacturing [3]. It can also be stated as the byproduct of raw material to develop the desired design product, which would be either biodegradable or nonbiodegradable.…”
Section: Introductionmentioning
confidence: 99%
“…Zero wastes also have an important role for environmental cleanliness and are carried out by Reduction, Reuse, and Recycling [9], [10]. Other opinions state that zero waste is a series of actions aimed at eliminating waste and challenging traditional Waste Management systems [11]- [14] Based on the results of observations that have been made to the community in Menceh Village, a lifestyle that still litters tend to cause more and more garbage piles not only in the yard but also on the side of the road. The damage is getting worse.…”
Section: Introductionmentioning
confidence: 99%