2020
DOI: 10.1016/j.tust.2020.103326
|View full text |Cite
|
Sign up to set email alerts
|

Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway station

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
2

Relationship

1
9

Authors

Journals

citations
Cited by 24 publications
(7 citation statements)
references
References 15 publications
0
7
0
Order By: Relevance
“…Liu [16] based on the PBA method of an underground station in Beijing, put forward the settlement and other parameter control standards of the project through numerical simulation combined with the on-site monitoring method. Xu [17] presented the monitoring data of the initial PBA method in China, demonstrating that the maximum surface settlements observed across different monitoring sections were not uniform. The author concluded that surface settlement was primarily attributable to the construction of the shield tunnel, the side guideway, and the middle guideway.…”
Section: Introductionmentioning
confidence: 99%
“…Liu [16] based on the PBA method of an underground station in Beijing, put forward the settlement and other parameter control standards of the project through numerical simulation combined with the on-site monitoring method. Xu [17] presented the monitoring data of the initial PBA method in China, demonstrating that the maximum surface settlements observed across different monitoring sections were not uniform. The author concluded that surface settlement was primarily attributable to the construction of the shield tunnel, the side guideway, and the middle guideway.…”
Section: Introductionmentioning
confidence: 99%
“…Consequently, constant improvements in construction methods and the emergence of new technical solutions have facilitated the expansion of many domestic underground projects (Song et al, 2020b;Huang et al, 2021). In particular, the expansion of subway stations through the addition of new superstructures to existing underground structures has proven economically advantageous (Xu et al, 2020;Liu et al, 2022). However, in the case of such expansion projects, large-scale excavation and the consequent unloading significantly impacts the existing subway structure.…”
Section: Introductionmentioning
confidence: 99%
“…Xu X and others carried out relevant research on PBA construction method relying on Beijing metro line 14. The eld monitoring data show that the surface settlement is mainly caused by the construction of side pilot tunnel and middle pilot tunnel (Xu X et al 2020). Yang Zixuan and others, relying on the West Extension tunnel of Beijing Metro underpass the existing line 5, optimized the construction scheme of PBA method through numerical simulation, and proposed that pouring the second lining buckle arch after excavating 1 / 4 of the total length of the tunnel in the middle pilot tunnel can effectively control the surface settlement (Yang Zixuan et al 2020).…”
Section: Introductionmentioning
confidence: 99%