2021
DOI: 10.1061/(asce)la.1943-4170.0000501
|View full text |Cite
|
Sign up to set email alerts
|

Causes of Delay in Smart and Complex Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 59 publications
0
5
0
1
Order By: Relevance
“…Muñoz-La Rivera et al [43] exploraron de la implementación de LC en la IC marroquí y y entrega más rápida del proyecto, mejorando la calidad, la seguridad y el desempeño ambiental y reduciendo la duración del período. Babalola, Ibem y Ezema [44] demostraron que el concepto esbelto es un gran apoyo para la "construcción limpia" y el uso de materiales contaminados y los impactos ambientales de los PC son mejores que en cualquier otro momento mediante la aplicación del concepto esbelto [45]. En India, LC negativos y mejorado la sostenibilidad para el medio ambiente.…”
Section: Lean Construction: Origen Y Principiosunclassified
“…Muñoz-La Rivera et al [43] exploraron de la implementación de LC en la IC marroquí y y entrega más rápida del proyecto, mejorando la calidad, la seguridad y el desempeño ambiental y reduciendo la duración del período. Babalola, Ibem y Ezema [44] demostraron que el concepto esbelto es un gran apoyo para la "construcción limpia" y el uso de materiales contaminados y los impactos ambientales de los PC son mejores que en cualquier otro momento mediante la aplicación del concepto esbelto [45]. En India, LC negativos y mejorado la sostenibilidad para el medio ambiente.…”
Section: Lean Construction: Origen Y Principiosunclassified
“…Moreover, access to real-time project progress status reports is one of the key concerns for construction project decisionmakers (Gunduz and Laitinen, 2018;Getuli et al, 2020). Radman et al (2021) have presented an analytical study to prioritise key factors causing delay and impacting timely decisions regardless of using progress tracking systems in smart construction projects. In terms of "smart" terms in construction projects, a widely accepted definition of "smart construction" is: a building design, construction and operation that, through collaborative partnerships, makes full use of digital technologies and industrialised manufacturing techniques to improve productivity, minimise whole life cost, improve sustainability and maximise user benefits (Construction Leadership Council 2018;Bucchiarone et al, 2019;Radman et al, 2021).…”
Section: Introductionmentioning
confidence: 99%
“…Generally, through the knowledge gained from literature, "delay management" is set of techniques such as Revised-Schedule, As-Planned and As-Built to measure projects performance from time, cost and scope perspectives (Indhu and Ajai, 2014). Apart from the above, in light of delay management, Radman et al (2021) analytically presented a statistical relation during construction life cycle phases between 1) technologies that have been used; and 2) key project participants such as clients, consultants, sub-contractors, and 3) those possible causes of delay factors such as material, workforce, equipment/tools, changes/variations, financing/funding, contractual relations and environment/government actions. Their study identified that regardless of using technologies to mitigate or monitor those delay factors caused/by caused projects, there is still rarely a comprehensive process to integrate technologies for managing delays, especially in real-time purpose.…”
Section: Introductionmentioning
confidence: 99%
“…On the other hand, the construction industry advances further every year with a diversity of embryonic, emerging or mature technologies (Radman et al, 2021). The Internet of things (IoT), artificial intelligence (AI), building information modeling (BIM), scheduling and budgeting software, smart contracts and many other substantial technologies have contributed to the development of new practical implications on the effective management of construction projects.…”
Section: Introductionmentioning
confidence: 99%
“…On the other hand, the construction industry advances further every year with a diversity of embryonic, emerging or mature technologies (Radman et al. , 2021).…”
Section: Introductionmentioning
confidence: 99%