2022
DOI: 10.3389/fbuil.2022.1009944
|View full text |Cite
|
Sign up to set email alerts
|

Causes and effects of contract management problems: Case study of road construction

Abstract: Contract management is a crucial component of any project. As construction projects are complex and difficult to manage, adequate attention must be given to the related contract management issues. Inexpert management can bring about serious unfavourable consequences that can even result in a project failure. This study aims to explore a specific case study: A private road construction project implemented in the Czech Republic. The analysis consists in identifying potential problems and discussion of their impl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(17 citation statements)
references
References 33 publications
0
16
0
1
Order By: Relevance
“…In this study, the "cracks" are corrected to be darker than the background, and the "free lime" is corrected to be whiter than the background to emphasize the distinction between the target area and the background area. Figures 9,10 show examples of images before and after color correction, respectively.…”
Section: Post-detection Scrutiny By Convolutional Neural Network-base...mentioning
confidence: 99%
See 2 more Smart Citations
“…In this study, the "cracks" are corrected to be darker than the background, and the "free lime" is corrected to be whiter than the background to emphasize the distinction between the target area and the background area. Figures 9,10 show examples of images before and after color correction, respectively.…”
Section: Post-detection Scrutiny By Convolutional Neural Network-base...mentioning
confidence: 99%
“…Poor contract documentation and omission of items in the contract are the highly-cited causes of rework under the client- [2,5,6,7,9,10,11,12,15,16,17,18,19,21,24,27,28,29,30,33] 20 2 Changes, modification, and revisions DEP1 [1,2,3,4,7,8,9,10,11,13,15,18,19,22,24,25,30,31,33] 19 3 Financial issues and lack of funding DEG1 [2,5,6,7,9,11,12,13,16,17,18,19,21,24,28,29,30,31] 18…”
Section: Procurement Stagementioning
confidence: 99%
See 1 more Smart Citation
“…The construction industry is often criticized for its poor performance [1] manifested in various areas such as time, cost, quality, and productivity. Many construction projects fail to meet their targets, resulting in time and cost overruns or quality issues that can lead to disputes [2][3][4]. In this regard, great expectations are associated with advancing digitization in the sector, which is referred to as Construction 4.0.…”
Section: Introductionmentioning
confidence: 99%
“…Hanak and Vitkova, in their research in 2022, aimed to identify dispute factors and the related consequences of a case study involving the construction of a road to commercial premises [21]. The research explored a specific case study: a private road construction project implemented in the Czech Republic.…”
Section: Introductionmentioning
confidence: 99%