2006
DOI: 10.1080/10170660609509008
|View full text |Cite
|
Sign up to set email alerts
|

Capacity Determination Model With Time Constraints and Batch Processing in Semiconductor Wafer Fabrication

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
9
0

Year Published

2009
2009
2024
2024

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 10 publications
(9 citation statements)
references
References 9 publications
0
9
0
Order By: Relevance
“…Therefore, a precise capacity calculation is necessary for resolving TC issues. Unfortunately, only a few studies have taken TC issues into consideration (Robinson andGiglio 1999, Tu andLiou 2006). Furthermore, STC issues in the back-end process have not been addressed in those models that consider TC.…”
Section: Introductionmentioning
confidence: 96%
See 3 more Smart Citations
“…Therefore, a precise capacity calculation is necessary for resolving TC issues. Unfortunately, only a few studies have taken TC issues into consideration (Robinson andGiglio 1999, Tu andLiou 2006). Furthermore, STC issues in the back-end process have not been addressed in those models that consider TC.…”
Section: Introductionmentioning
confidence: 96%
“…Previous studies have indicated that a sufficient protective capacity is the foundation for effectively managing TC issues (Robinson and Giglio 1999, Christe and Wu 2002, Tu and Liou 2006. Abundant capacity, nevertheless, will not be realised in wafer fabrication.…”
Section: Introductionmentioning
confidence: 97%
See 2 more Smart Citations
“…C.-H. Wu et al Tu and Liou (2006) consider a GI/G/m queueing model and develop a capacity planning method in systems with time constraints. Kitamura et al (2006) develop a scrap risk evaluation method in an M/M/1 queueing system with process queue time constraint.…”
mentioning
confidence: 99%