2021
DOI: 10.1088/1757-899x/1030/1/012127
|View full text |Cite
|
Sign up to set email alerts
|

Calculation of water hammer on the pressure pipeline of modernized irrigation pumping station

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
14
0
1

Year Published

2021
2021
2021
2021

Publication Types

Select...
8

Relationship

2
6

Authors

Journals

citations
Cited by 18 publications
(15 citation statements)
references
References 2 publications
0
14
0
1
Order By: Relevance
“…Taking into account the influence of secondary flows, assumptions were made based on the results of an experimental study of the flow in hydraulic structures of the PS and pumps [11,12]:…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Taking into account the influence of secondary flows, assumptions were made based on the results of an experimental study of the flow in hydraulic structures of the PS and pumps [11,12]:…”
Section: Resultsmentioning
confidence: 99%
“…The use of the principle of dissipation made it possible to extend the regularities of dividing the flow into transit and vortex from hydraulic structures to the flow path of pumps; in this case, the pump runs at reduced flow. The design of the water supply structures is designed according to traditional layouts, which do not take into account the peculiarities of the hydraulic operating conditions of the water supply complex [10,11,12].…”
Section: Introductionmentioning
confidence: 99%
“…We now move on to justify the shape of the working surfaces of the device cover covers. In solving this problem, we proceed from the condition that the time of interaction between the working surface of the cover and the parts of the mouth is minimal [20][21][22][23][24][25][26][27][28][29]. This is due to the fact that, firstly, the sheets are easily moved along the working surface, and secondly, the technological process is carried out with minimal energy consumption.…”
Section: Resultsmentioning
confidence: 99%
“…Under such conditions, the organization of rational leaching of the headwater is of paramount importance. [4,5,7,8,9,10,14] The department "Use of water energy and pumping stations" of the Tashkent Institute of Irrigation and Agricultural Mechanization Engineers purposefully deals with the issues of improving the efficiency of operation of hydraulic structures and equipment of hydropower facilities (pumping stations and hydroelectric power plants) [15,16,17,18,19]. This article proposes a method for calculating the duration of washing the headwater of Indian-type hydrosystems to improve the conditions for water intake into the supply channels of the hydroelectric power station.…”
Section: Introductionmentioning
confidence: 99%