2015
DOI: 10.1016/s1876-3804(15)30033-1
|View full text |Cite
|
Sign up to set email alerts
|

Calculation of micro-annulus size in casing-cement sheath-formation system under continuous internal casing pressure change

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
24
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 93 publications
(28 citation statements)
references
References 5 publications
0
24
0
Order By: Relevance
“…24 Nonetheless, the cementing technology is hard to achieve because that the top of the formation under the deepwater is weak and the cementing fluid may loss. 24 Nonetheless, the cementing technology is hard to achieve because that the top of the formation under the deepwater is weak and the cementing fluid may loss.…”
Section: Comparison Of Pressure Relief Effect With Other Mitigationmentioning
confidence: 99%
See 1 more Smart Citation
“…24 Nonetheless, the cementing technology is hard to achieve because that the top of the formation under the deepwater is weak and the cementing fluid may loss. 24 Nonetheless, the cementing technology is hard to achieve because that the top of the formation under the deepwater is weak and the cementing fluid may loss.…”
Section: Comparison Of Pressure Relief Effect With Other Mitigationmentioning
confidence: 99%
“…Full sealing cementing is used to eliminate annulus, which seems effectively avoid APB produce. 24 Nonetheless, the cementing technology is hard to achieve because that the top of the formation under the deepwater is weak and the cementing fluid may loss. Besides, the method may cement the subsea wellhead without accurate operation.…”
Section: Comparison Of Pressure Relief Effect With Other Mitigationmentioning
confidence: 99%
“…In equation (11), parameter A is used to distinguish the maximum and minimum principal stress; A 1 when σ θθ > σ rr , while A − 1 for σ θθ < σ rr . When the failure coe cient F is positive, shear failure occurs.…”
Section: Cement Setting Stagementioning
confidence: 99%
“…e high casing pressure encountered in hydraulic fracturing tremendously challenges the well integrity [5][6][7]. e sealing failure could be in different types including shear or tensile failure of cement sheath [8] and microannulus at the cement-casing interface (first interface) or cement-formation interface (second interface) [9][10][11]. If the potential failure mode is correctly estimated, measures can be accordingly taken to ensure the well integrity.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation