Initial Reports of the Deep Sea Drilling Project 1979
DOI: 10.2973/dsdp.proc.47-1.122.1979
|View full text |Cite
|
Sign up to set email alerts
|

C1 to C7 Hydrocarbons from IPOD Holes 397 and 397A

Abstract: Gases from sediment pockets were monitored onboard ship during continuous coring to a depth of 1453 meters. Gas pockets first appeared at a sediment depth of 80 meters (Hole 397) and continued irregularly to the bottom of Hole 397A. The gas contained small quantities (0.1 to 1.3%) of methane from 30 to 124 meters, with major components of air and C0 2 . The odor of H 2 S was noted in the cores from 9 to 151 meters. Starting at 196 meters, methane became a significant component (43%) and then varied irregularly… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
19
0

Year Published

1980
1980
2013
2013

Publication Types

Select...
6
2

Relationship

2
6

Authors

Journals

citations
Cited by 17 publications
(21 citation statements)
references
References 11 publications
2
19
0
Order By: Relevance
“…At Site 953, closest to the uplift structures, the methane concentration is below 34 ppm (Schmincke, Weaver, Firth, et al, 1995), whereas values of up to 54,965 ppm were recorded at Site 955. The same is true for Deep Sea Drilling Project Site 397 (Whelan, 1979). In summary, the methane content can change over short distances, and considerable concentrations can occur locally.…”
Section: Line 203mentioning
confidence: 69%
“…At Site 953, closest to the uplift structures, the methane concentration is below 34 ppm (Schmincke, Weaver, Firth, et al, 1995), whereas values of up to 54,965 ppm were recorded at Site 955. The same is true for Deep Sea Drilling Project Site 397 (Whelan, 1979). In summary, the methane content can change over short distances, and considerable concentrations can occur locally.…”
Section: Line 203mentioning
confidence: 69%
“…Analysis via the Hewlett-Packard is a cold-trap technique in which Ci is not determined. For complete details, consult Whelan (1979). a Measurement made by puncturing liner with needle fitted with gauge.…”
Section: Possible Relation Between Hydrates and High-porosity Litholomentioning
confidence: 99%
“…The method for rapid gas analyses was evaluated on Leg 47 (von Rad, Ryan, et al, 1977;Whelan, 1979). Samples from core gas pockets were collected through the core liner in "vacutainers" immediately after the cores were brought on deck.…”
Section: Cj-cs Hydrocarbon Analysesmentioning
confidence: 99%
“…Sample introduction into the Hewlett-Packard GC was accomplished with a %" × 8" loop packed with 60/80-mesh alumina (Analabs, Activated Alumina F-l) attached to a Carle sampling valve (microvolume valve 2014 or minivolume valve 2818; Whelan, 1979). A stream of dry helium, with the flow rate adjusted to 15 cc/ min.…”
Section: Cj-cs Hydrocarbon Analysesmentioning
confidence: 99%