2018
DOI: 10.1088/1742-6596/954/1/012024
|View full text |Cite
|
Sign up to set email alerts
|

Business Centre Development Model of Airport Area in Supporting Airport Sustainability in Indonesia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0
5

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 26 publications
(14 citation statements)
references
References 1 publication
0
7
0
5
Order By: Relevance
“…The general equation is [11]- [19]: Y = α + β1 X1 + β2 X2 + .... + βn Xn. Y is dependent variable, and X is independent variables, α is a constant (intercept) and β is the regression coefficient of each independent variable [11][12][13][14][15][16][17][18] Hypothesis of this study are: Y=α -β1 X1 -β2 X2 -.... -β9 X9. Y= % Profit X1 = Material waste of formwork has negative effect (-) to the profit of a project X2 = Material waste rebar has negative effect (-) to the profit of a project X3 = Material waste of ready mix concrete has negative effect (-) to the profit of a project X4 = Material waste of B aggregate has negative effect (-) to the profit of a project X5 = Material waste of land fill has negative effect (-) to the profit of a project X6 = Material waste of lean concrete has negative effect (-) to the profit of a project X7 = Material waste of cement has negative effect (-) to the profit of a project X8 = Material waste of stone has negative effect (-) to the profit of a project X9 = Material waste of sand has negative effect (-) to the profit of a project…”
Section: Methodsmentioning
confidence: 99%
“…The general equation is [11]- [19]: Y = α + β1 X1 + β2 X2 + .... + βn Xn. Y is dependent variable, and X is independent variables, α is a constant (intercept) and β is the regression coefficient of each independent variable [11][12][13][14][15][16][17][18] Hypothesis of this study are: Y=α -β1 X1 -β2 X2 -.... -β9 X9. Y= % Profit X1 = Material waste of formwork has negative effect (-) to the profit of a project X2 = Material waste rebar has negative effect (-) to the profit of a project X3 = Material waste of ready mix concrete has negative effect (-) to the profit of a project X4 = Material waste of B aggregate has negative effect (-) to the profit of a project X5 = Material waste of land fill has negative effect (-) to the profit of a project X6 = Material waste of lean concrete has negative effect (-) to the profit of a project X7 = Material waste of cement has negative effect (-) to the profit of a project X8 = Material waste of stone has negative effect (-) to the profit of a project X9 = Material waste of sand has negative effect (-) to the profit of a project…”
Section: Methodsmentioning
confidence: 99%
“…The t-count value is obtained with the help of the SmartPLS 2.0 software, while the t-table value corresponds to the alpha and degree of freedom. Table 1 and Table 2 were referred to determine the validity and reliability of the results [1][2][3][4][5][6][7][8][9][10] …”
Section: Methodsmentioning
confidence: 99%
“…This study aims to analyze the economic growth of airport areas in Indonesia. Problem identified includes regional economic growth, contribution of airport management to regional revenue and airport performance evaluation to Local Revenue Budget (APBD) [1][2][3][4][5] …”
Section: Introductionmentioning
confidence: 99%
“…Cup rooting will also be supported by a network of hyphae of VAM that would connect between the dots on the roots of plants with a point on the ground deeper and point at the root of the other, so that the formation of a network of hyphae VAM will strengthen buffering capacity and power hold against nutrients, water, minerals, and other microbes that absorbed into the rhizosphere due VAM activity itself. Thus, the presence of VAM + host plants at SDN method will provide benefits in several ways [10]- [15]:…”
Section: Methodsmentioning
confidence: 99%