2021
DOI: 10.12700/aph.18.4.2021.4.7
|View full text |Cite
|
Sign up to set email alerts
|

Bus Transport Process Networks with Arbitrary Launching Times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…Process synthesis aims to find the optimal sub-structure and configuration of an extensive system of functional units and materials [13]. The method is applied in many fields, such as supply chain optimization [12], energy optimization [1], and vehicle scheduling [3,6]. The search for the optimal sub-network can be formulated as a MILP problem, where the number of binary variables equals the number of units, meaning the complexity of the problem is NP-hard.…”
Section: Introductionmentioning
confidence: 99%
“…Process synthesis aims to find the optimal sub-structure and configuration of an extensive system of functional units and materials [13]. The method is applied in many fields, such as supply chain optimization [12], energy optimization [1], and vehicle scheduling [3,6]. The search for the optimal sub-network can be formulated as a MILP problem, where the number of binary variables equals the number of units, meaning the complexity of the problem is NP-hard.…”
Section: Introductionmentioning
confidence: 99%