Blasting Design Without Subdrilling on Jointed Limestone to Optimize Fragmentation and Blasting Cost

Abstract: Bench blasting operation on limestone opencast mining at PT. Semen Padang (Persero), Indonesia performed by electric blasting using coloumn loading system. Limestone deposit consist of three type of rock characteritics that are hard limestone, sugary limestone, and jointed limestone. In general, a good blasting design should implementing subdrilling to avoid toe. In this case of study the subdrilling is not need due to the present of many cracks caused by basalt intrusion. Blasting geometry that applied to bla… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
1
0
2

Year Published

2022
2022
2022
2022

Publication Types

Select...
2

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 2 publications
0
1
0
2
Order By: Relevance
“…Dalam rangka meningkatkan efisiensi penggalian overburden dan mengatasi getaran tanah akibat peledakan serta meningkatkan kestabilan lereng, maka harus dirancang geometri peledakan, penggunaan bahan peledak, dan sistem delay (Ilahi, Ibrahim dan Swardi, 2014). Ukuran fragmentasi yang dihasilkan dengan menggunakan desain geometri peledakan tertentu diharapkan sesuai dengan kapasitas bucket excavator (Toha, Bochori dan Waluyo, 2017).…”
Section: Pendahuluanunclassified
See 1 more Smart Citation
“…Dalam rangka meningkatkan efisiensi penggalian overburden dan mengatasi getaran tanah akibat peledakan serta meningkatkan kestabilan lereng, maka harus dirancang geometri peledakan, penggunaan bahan peledak, dan sistem delay (Ilahi, Ibrahim dan Swardi, 2014). Ukuran fragmentasi yang dihasilkan dengan menggunakan desain geometri peledakan tertentu diharapkan sesuai dengan kapasitas bucket excavator (Toha, Bochori dan Waluyo, 2017).…”
Section: Pendahuluanunclassified
“…Sistem peledakan overburden di Pit 1 Utara Banko Barat menerapkan non-electric detonator (nonel) yang dikombinasikan dengan sistem inisiasi menggunakan dayadet electric detonator yang dihubungkan ke blasting machine menggunakan lead wire. Diameter bit yang digunakan adalah 200 mm, dan tujuan peledakan pada material very soft strength rock Bienawski 2 -20 Mpa (Toha, Bochori dan Fajar, 2020), hanya untuk meretakkan material (Toha, Bochori dan Waluyo, 2017). Pola pengeboran lubang handak adalah sistem zig-zag dengan geometri peledakan seperti tertera pada Tabel 2.…”
Section: Rancangan Teknis Peledakanunclassified
“…2). In order to increase the efficiency of overburden excavation, overcome ground vibrations due to blasting, and increase slope stability, it is necessary to design blasting geometry, use of explosives, and delay systems [9]- [11].…”
Section: Introductionmentioning
confidence: 99%