BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance

Abstract: The operation and maintenance (O&M) is the longest and costliest phase during the entire building lifecycle. In recent decades, with the rapidly increasing costs of new constructions, the effective maintenance has become more important to the existing buildings, particularly to their fabric components, which include both architectural and structural items for maintaining physical characteristics and ensuring the normal performance of the existing building over its lifecycle. However, building maintenance costs… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
29
0
6

Year Published

2020
2020
2022
2022

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 78 publications
(36 citation statements)
references
References 35 publications
(36 reference statements)
1
29
0
6
Order By: Relevance
“…VOSviewer was used for bibliometric analysis. Few studies use keyword visualization methods amongst the studies reported in existing publications, most of which use logical diagrams [34][35][36], scene diagrams [37][38][39][40], roadmaps [41][42][43], and strategy diagrams [44][45][46]. The VOSviewer has been used to review the latest technology of BIM supported building performance [47], and at the same time, vosviewer is used as a Scientometric Analysis in scientific landscape of sustainable urban and rural areas research [48] and mapping two decades of autonomous vehicle research [49].…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…VOSviewer was used for bibliometric analysis. Few studies use keyword visualization methods amongst the studies reported in existing publications, most of which use logical diagrams [34][35][36], scene diagrams [37][38][39][40], roadmaps [41][42][43], and strategy diagrams [44][45][46]. The VOSviewer has been used to review the latest technology of BIM supported building performance [47], and at the same time, vosviewer is used as a Scientometric Analysis in scientific landscape of sustainable urban and rural areas research [48] and mapping two decades of autonomous vehicle research [49].…”
Section: Methodsmentioning
confidence: 99%
“…The main research methods used in this phase include case studies, literature review, interviews, and comparative analysis. Table 3 building operation phase discusses how urban renewal is more sustainable [34,61,78], by identifying and alleviating barriers to smart and sustainable practices in the built environment [61], and prioritizing them, which provides a basis for decision makers to make feasible decisions. Operating information is managed through the integration of BIM and FM systems.…”
Section: Micro Scheme Analysismentioning
confidence: 99%
“…The system will provide a way to track and manage the process that is happening in the cloud and provide an ability to re-do the experiment. Well implemented management system can increase company performance, by reducing maintenance cost [5] and execution time, while using the optimum value [11].…”
Section: Introductionmentioning
confidence: 99%
“…Other researchers discussed the issue of constriction workers productivity from KPIs [5]. In many cases, KPIs are addressed by the issue of costs in construction [6]. Costs associated with the management of construction projects and the total cost of the construction project are discussed many studies [7], [8], [9].…”
Section: Introductionmentioning
confidence: 99%