2017
DOI: 10.3130/jaabe.16.511
|View full text |Cite
|
Sign up to set email alerts
|

BIM-based File Synchronization and Permission Management System for Architectural Design Collaboration

Abstract: In building information modelling (BIM), the amount of information increases and architectural design processes become more complex as projects expand. This is because while a collaboration environment is important for smooth communication among experts, this has not been realized because of unclassified file synchronization and permission settings among team members. Therefore, this study aims to support cooperation in BIM modelling projects by synchronizing BIM data from different computers and rendering BIM… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 3 publications
0
6
0
Order By: Relevance
“…Very few process barriers were allocated to training. Sources: (Abrishami et al, 2014;Akponeware and Adamu, 2017;Alreshidi et al, 2016bAlreshidi et al, , 2017Amann and Borrmann, 2016;Arayici et al, 2018;Bassanino et al, 2014;Beach et al, 2017;Becerik-Gerber et al, 2011;Boton et al, 2013;Bozoglu, 2016;Cao et al, 2017b;Chen and Hou, 2014;Chen et al, 2013;Ciribini et al, 2016;Comiskey et al, 2017;Du et al, 2017;Fernando et al, 2013;Fu et al, 2006;Goulding et al, 2014;Hassan Ibrahim, 2013;Hosseini et al, 2018;Hu et al, 2016;Hu and Zhang, 2011;Isikdag, 2012;Isikdag and Underwood, 2010;Jiao et al, 2013;Kim et al, 2017;Lee et al, 2015;Liu et al, 2015;Ma and Ma, 2017;Niknam and Karshenas, 2015;Rafiq and Rustell, 2013;Shafiq et al, 2013;Shin, 2017;Sidawi and Hamza, 2012;Singh et al, 2011;Solnosky, 2016;Wei et al, 2014;Zhang et al, 2017a) As shown in Table 1…”
Section: Process Barriersmentioning
confidence: 99%
“…Very few process barriers were allocated to training. Sources: (Abrishami et al, 2014;Akponeware and Adamu, 2017;Alreshidi et al, 2016bAlreshidi et al, , 2017Amann and Borrmann, 2016;Arayici et al, 2018;Bassanino et al, 2014;Beach et al, 2017;Becerik-Gerber et al, 2011;Boton et al, 2013;Bozoglu, 2016;Cao et al, 2017b;Chen and Hou, 2014;Chen et al, 2013;Ciribini et al, 2016;Comiskey et al, 2017;Du et al, 2017;Fernando et al, 2013;Fu et al, 2006;Goulding et al, 2014;Hassan Ibrahim, 2013;Hosseini et al, 2018;Hu et al, 2016;Hu and Zhang, 2011;Isikdag, 2012;Isikdag and Underwood, 2010;Jiao et al, 2013;Kim et al, 2017;Lee et al, 2015;Liu et al, 2015;Ma and Ma, 2017;Niknam and Karshenas, 2015;Rafiq and Rustell, 2013;Shafiq et al, 2013;Shin, 2017;Sidawi and Hamza, 2012;Singh et al, 2011;Solnosky, 2016;Wei et al, 2014;Zhang et al, 2017a) As shown in Table 1…”
Section: Process Barriersmentioning
confidence: 99%
“…Building Information Modeling (BIM) is interpreted as a methodology rather than as a tool to enable the digital modeling of a building. The application of BIM in supporting construction processes has been documented in large-scale high-rise buildings like multi-residential houses [10] or medium-to-large-scale health-care projects [11,12]. The three-dimensional visualization of the building ensures a better comprehension of the construction sequence.…”
Section: Theoretical Approachesmentioning
confidence: 99%
“…Hervey Pruvost of Shanghai Jiaotong University and others have studied the automatic generation of building structure models and structural model conversion based on IFC standards and realised the automatic compeers of mechanical replicas from the construction material of the IFC model as well as the IFC model and SAP2000, ETABS and other structural calculation software [10]. El‐Derby of the Beijing University of Aeronautics and Astronautics and others have studied data conversion between the IFC model and the PKPM model and have completed the data conversion function between the IFC model and the PKPM model [11]. Yue, L. of Chongqing University and others have researched the application of BIM technology in architectural design.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Current structure supervision apparatuses can be combined with BIM to spread out its competencies in the structure system [9]. It has been extensively recognised in structure production [10, 11]. So, to present the current position of BIM in Industry 4.0 in the framework of the creative industry to recognise the indication on the addition of BIM with digital technologies for example keen apparatuses, sensor schemes, and keen constituents.…”
Section: Introductionmentioning
confidence: 99%