2021
DOI: 10.1049/cim2.12036
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of a building collaborative platform for Industry 4.0 based on Building Information Modelling technology

Abstract: Technology and revolutions have powered the growth of Industry 4.0, the fourth industrial uprising. Industry 4.0 inspires progress and expansion through its efficiency capacity, as given in the literature. To improve the design quality and design efficiency of construction engineering units, this study adopts Building Information Modelling technology concepts. The implementation of Building Information Modelling in construction developments includes the digital demonstration of the fleshly and efficient featur… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(9 citation statements)
references
References 43 publications
(68 reference statements)
0
8
0
Order By: Relevance
“…Construction businesses' process, as the heart of the project with a collaborative and autonomous synchronization system, gives a new means to anticipate, manage, and monitor the quality and performance of the project across the whole project life cycle. 3, the second number after the colon is the quotation, and p is the page [28,35,42,49,53,64,71].…”
Section: Theme 5: Construction Managementmentioning
confidence: 99%
“…Construction businesses' process, as the heart of the project with a collaborative and autonomous synchronization system, gives a new means to anticipate, manage, and monitor the quality and performance of the project across the whole project life cycle. 3, the second number after the colon is the quotation, and p is the page [28,35,42,49,53,64,71].…”
Section: Theme 5: Construction Managementmentioning
confidence: 99%
“…It takes only a few minutes to recharge, and the charge and discharge phases can be repeated thousands of times without degrading the magnet's strength. Depending on the system's capacity, the recharging time can be shortened to satisfy specified parameters [15,23]. e SMES system is a DC current storage device that uses a strong magnetic field to store energy [1].…”
Section: Superconducting Magnetic Energy Storage (Smes)mentioning
confidence: 99%
“…Unavailability of resources The barriers to the implementation of BIM software were further identified as lack of training, insufficient government provisions, and lack of market motivation [2]. Skills and training challenges can also be a barrier to BIM implementation [10]. Perceived usefulness was found to be the highest factor influencing BIM technology adoption [11].…”
Section: Barriers To Implement Bim For Candd Waste Managementmentioning
confidence: 99%