2020
DOI: 10.1061/(asce)co.1943-7862.0001745
|View full text |Cite
|
Sign up to set email alerts
|

Big Data Analytics System for Costing Power Transmission Projects

Abstract: Inaccurate cost estimates have significant impacts on the final cost of power transmission projects and erode profits. Methods for cost estimation have been investigated thoroughly, but they are not used widely in practice. The purpose of this study is to leverage a Big Data architecture, to manage the large and diverse data required for predictive analytics. This paper presents a Predictive Analytics and Modelling System (PAMS) that facilitates the use of different data-driven cost prediction methods. A 2.75 … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 14 publications
(3 citation statements)
references
References 79 publications
0
3
0
Order By: Relevance
“…This consideration assumes that the use of advanced technologies and the use of data analytics and the concept of big data can shorten the delivery of material, which can affect the shortening of construction time [6,16,31,32]. If the first hypothesis is assumed, a high degree of correlation with the second hypothesis can be expected in this relationship.…”
Section: Hypothesis 2 Exploitation Of Big Data Concept and Supply Chain Management Shortens Construction Timementioning
confidence: 99%
See 1 more Smart Citation
“…This consideration assumes that the use of advanced technologies and the use of data analytics and the concept of big data can shorten the delivery of material, which can affect the shortening of construction time [6,16,31,32]. If the first hypothesis is assumed, a high degree of correlation with the second hypothesis can be expected in this relationship.…”
Section: Hypothesis 2 Exploitation Of Big Data Concept and Supply Chain Management Shortens Construction Timementioning
confidence: 99%
“…This is also a logical assumption when monitoring key performance indicators. In implementing this concept (several studies have confirmed that cost reduction may be a sufficient motivator for implementing BD and ICT [4,32]), it could be one of the most important motivators. If the dependence between the use of BD in SCM and cost reduction is also demonstrated empirically, this can lead to faster implementation of these technologies.…”
Section: Hypothesis 2 Exploitation Of Big Data Concept and Supply Chain Management Shortens Construction Timementioning
confidence: 99%
“…Yang et al [38] used a CNN to learn important features related to rice yields from low altitude remote-sensing images and established a model to predict grain yield. Delgado et al [39] proposed a prediction analysis and modeling system and used a 2.75-million-point power-transmission-project dataset for conducting a case study. Three of the most popular cost-estimation models (linear regression, support vector regression, and ANNs) based on big data have been brought to fruition.…”
Section: Introductionmentioning
confidence: 99%