Bid responsive generation rescheduling for congestion management in electricity market

Abstract: Electricity market economics is one of the vital factors which play a key role in achieving the efficient operation of the power system. Economic operation along with secure & reliable operation is must for ensuring optimum utilization of the resources in order to maximize social welfare. This article presents a method for achieving economic operation of electricity market in case of congestion occurring in the system. The generator sensitivity (GS) method alone can manage the system congestion, however it doe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 18 publications
0
4
0
Order By: Relevance
“…The congested line power flow with IMRFO has been curtailed to 198.09 MW and is below its maximum TABLE 14. Price bids for 118 bus system [48].…”
Section: B 118-bus Systemmentioning
confidence: 99%
“…The congested line power flow with IMRFO has been curtailed to 198.09 MW and is below its maximum TABLE 14. Price bids for 118 bus system [48].…”
Section: B 118-bus Systemmentioning
confidence: 99%
“…Congestion management (CM) is supposed to be one of the most crucial issues of restructured power system [1]. In the emerging day-ahead hybrid power market, some effective financial tools are inevitable to manage congestion in which bid-based generation rescheduling (GR) is found to be most eminent [2]. For bid-based GR, three…”
Section: Introductionmentioning
confidence: 99%
“…One is the initial bid and the remaining two are the post congestion bids which are incremental and decremental rescheduling bids. According to them, suppliers have to amend their real power generation along with optimizing flows and thus support in mitigation of congestion [2]. In the literature, different approaches have been suggested for this purpose based on the classical method [3], [4].…”
Section: Introductionmentioning
confidence: 99%
“…Congestion management (CM) is supposed to be one of the most crucial issues of restructured power system [1]. In the emerging day-ahead hybrid power market, some effective financial tools are inevitable to manage congestion in which bid-based generation rescheduling (GR) is found to be most eminent [2]. For bid-based GR, three types of bids are required to be submitted by suppliers.…”
mentioning
confidence: 99%