Benchmarking manufacturing planning and control (MPC) systems

Abstract: Examines the manufacturing planning and control (MPC) systems in three supply chain environments in Hong Kong, based on a questionnaire survey. Studies five MPC modules: master production scheduling; capacity requirements planning; material planning; purchasing; and inventory control. Studies the performance of each MPC module. The supply chain environments that are taken into consideration include agile, leagile, and lean. Based on a weighted organizational performance index, the sample organizations are segr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0
2

Year Published

2007
2007
2022
2022

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 21 publications
(13 citation statements)
references
References 35 publications
0
11
0
2
Order By: Relevance
“…Chan et al [5] proposed a combined list of competitive priorities, including plant and equipment, production planning and control, labour and staffing, product design and engineering, and organisation and management.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Chan et al [5] proposed a combined list of competitive priorities, including plant and equipment, production planning and control, labour and staffing, product design and engineering, and organisation and management.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Based on the study of factors showing association with productivity and the suggestions by the respondents to be reported on in the currently unpublished thesis of Ramdass [14], and relevant literature [3] [4] [5] [15], the recommendations for productivity improvement are summed up as follows:…”
Section: A Strategy For Productivity Improvementmentioning
confidence: 99%
“…Modules employed in MRP vary considerably. Based on MRP software functions and literature (Chan and Burns, 2002;Lau et al, 2002;, we chose ten variables to measure MRP implementation degree. They are: Following the same approach taken in Table 5, we found the Cronbach's α reliability measures for MRP and JIT implementation degree are 0.92 and 0.89, respectively.…”
Section: Measuring the Degree Of Jit And Mrp Implementationmentioning
confidence: 99%
“…Over the last two decades, new manufacturing technologies such as Materials Requirements Planning (MRP), Just-in-Time (JIT), Optimal Production Technology (OPT) and Enterprise Resource Planning (ERP), have marched into the Chinese manufacturing environment in quick succession. Although no official data available regarding the implementation status of different systems, some survey reports that MRP and JIT are the most widely adopted technologies (Chan and Burns, 2002;Zhang, 1998). The former originated in the USA (Orlicky, 1975), while the latter was introduced by Japan.…”
Section: Introductionmentioning
confidence: 99%
“…Este evoluiu de conceitos anteriores como Monteiro e Costa / Otimização do Processo de Inventário em Loja 15ª Conferência da Associação Portuguesa de Sistemas de Informação (CAPSI 2015) 556 o material requirement planning (MRP) e veio provocar alterações no paradigma das organizações [Jacobs 2007]. Este evoluiu de sistemas que desempenhavam um conjunto de tarefas independentes associadas apenas a um determinado departamento para um sistema de gestão que reúne informações e dados de todos os departamentos de uma empresa de forma integrada [Chan 2002].…”
Section: Introductionunclassified