2014
DOI: 10.1117/12.2057345
|View full text |Cite
|
Sign up to set email alerts
|

Benchmarking hardware architecture candidates for the NFIRAOS real-time controller

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
1

Year Published

2014
2014
2018
2018

Publication Types

Select...
4
2

Relationship

4
2

Authors

Journals

citations
Cited by 7 publications
(6 citation statements)
references
References 0 publications
0
5
1
Order By: Relevance
“…GPUs excel in cost, floating-point processing and development costs while FPGAs are known for their predictable timing latency, low power consumption and high-speed interfacing options. 7,8 A recent stagnation in compelling FPGA hardware, the high initial programming overhead for FPGAs and the rapid evolution of GPU and Central Processing Unit (CPU) performance has resulted in GPUs and CPUs dominating the choice of computing hardware for NFIRAOS 3,9,10 and E-ELT 11,12 AO over the years. The cost of hardware and development makes GPUs a compelling hardware choice for AO.…”
Section: Introductionmentioning
confidence: 99%
“…GPUs excel in cost, floating-point processing and development costs while FPGAs are known for their predictable timing latency, low power consumption and high-speed interfacing options. 7,8 A recent stagnation in compelling FPGA hardware, the high initial programming overhead for FPGAs and the rapid evolution of GPU and Central Processing Unit (CPU) performance has resulted in GPUs and CPUs dominating the choice of computing hardware for NFIRAOS 3,9,10 and E-ELT 11,12 AO over the years. The cost of hardware and development makes GPUs a compelling hardware choice for AO.…”
Section: Introductionmentioning
confidence: 99%
“…Building upon the RTC Preliminary Design that was described in [1] [2] [3], this paper summarizes updated architectural details and prototyping results that were presented as part of the RTC's Final Design, which successfully passed its external review in December 2017. This involved external reviewers from key international organizations.…”
Section: Introductionmentioning
confidence: 99%
“…During the RTC Trade Study 5,6 it was demonstrated that one high-end Intel Xeon CPU (E5-2697 V2) was both required and adequate to perform the MVM corresponding to one quadrant of one LGS WFS.…”
Section: Hop Server Hardwarementioning
confidence: 99%