2016 IEEE 16th International Conference on Environment and Electrical Engineering (EEEIC) 2016
DOI: 10.1109/eeeic.2016.7555748
|View full text |Cite
|
Sign up to set email alerts
|

Battery energy storage systems for the provision of primary and secondary frequency regulation in Italy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
9
0
1

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(10 citation statements)
references
References 11 publications
0
9
0
1
Order By: Relevance
“…M ULTI megawatt grid-scale Energy Storage Systems (ESS), in particular those using batteries as the storage technology (BESS), have typically been used for asset deferral applications, using bulk energy storage to provide peak load shaving, allowing transmission system upgrades to be delayed [1]- [3]. More recent applications for ESSs have included operational services such as primary and secondary reserve provision, and enhanced frequency response (EFR) [4]- [6]. These services require lower overall energy storage capabilities than the reinforcement deferral applications, and so other ESSs that use storage technologies such as ultracapacitors (UC) have been proposed for these applications [7].…”
Section: Introductionmentioning
confidence: 99%
“…M ULTI megawatt grid-scale Energy Storage Systems (ESS), in particular those using batteries as the storage technology (BESS), have typically been used for asset deferral applications, using bulk energy storage to provide peak load shaving, allowing transmission system upgrades to be delayed [1]- [3]. More recent applications for ESSs have included operational services such as primary and secondary reserve provision, and enhanced frequency response (EFR) [4]- [6]. These services require lower overall energy storage capabilities than the reinforcement deferral applications, and so other ESSs that use storage technologies such as ultracapacitors (UC) have been proposed for these applications [7].…”
Section: Introductionmentioning
confidence: 99%
“…For the analysis of nonlinear simulations of EPS using Simulink, the following disturbances cases were applied in the system: In the identification of the best bus for the connection of the first BESS in the system, the frequency of Center of Intertia (COI) and average frequency are verified. It is possible to extract the frequency of the COI of the system (f COI ) from (20) [30,31], from the measured frequencies of generators and its inertia constants (synchronous and wind farm):…”
Section: Validation Of Results Through Nonlinear Simulationsmentioning
confidence: 99%
“…BESS devices are not a mature technology, and the mathematical models are still dependent on the specifications of manufacturers. In the literature, different approaches are trying to tackle the BESS modeling, such as those mentioned in [5,6,[9][10][11][12][13][16][17][18][19][20][21][22][23]. As a result, the development of a generic model to represent the dynamic performance of BESS models is a challenge.…”
Section: Bess Generic Modelmentioning
confidence: 99%
“…Renewable energy sources are also used to reduce carbon emission and ultimately reduces greenhouse gasses emission from the environment. But, due to the very high penetration of energy systems, there is a need for frequency regulation, hence different control strategies are employed to overcome this problem [24]. The energy storage systems are also needed to compensate for the different characteristics of renewable-based energy systems.…”
Section: Introductionmentioning
confidence: 99%