Available power generation cycles to be coupled with the liquid natural gas (LNG) vaporization process in a Spanish LNG terminal

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0
1

Year Published

2011
2011
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 60 publications
(15 citation statements)
references
References 33 publications
0
14
0
1
Order By: Relevance
“…At TBSs, the pressure is reduced from 1.7 MPa (approximately 250 Psi) to 0.4 MPa (approximately 60 Psi) by employing throttling valves, which waste large amount of pressure energy (availability). Several methods have been proposed for recovering this huge wasted energy (Querol et al, 2011;Farzaneh-Gord and Deymi-Dashtebayaz, 2009;Chaczykowski et al, 2011;He and Ju, 2014;Farzaneh-Gord and Kargaran, 2010;Farzaneh-Gord and Sadi, 2008;Rosen and Scott, 1998). …”
Section: Introductionmentioning
confidence: 98%
“…At TBSs, the pressure is reduced from 1.7 MPa (approximately 250 Psi) to 0.4 MPa (approximately 60 Psi) by employing throttling valves, which waste large amount of pressure energy (availability). Several methods have been proposed for recovering this huge wasted energy (Querol et al, 2011;Farzaneh-Gord and Deymi-Dashtebayaz, 2009;Chaczykowski et al, 2011;He and Ju, 2014;Farzaneh-Gord and Kargaran, 2010;Farzaneh-Gord and Sadi, 2008;Rosen and Scott, 1998). …”
Section: Introductionmentioning
confidence: 98%
“…Also, in Querol et al [6], a study of the boil off gas in Spanish LNG terminals managed using re-condensers is carried out, where the electricity consumed by these terminals is bought on the Spanish wholesale market. Furthermore, several power generating options using current available equipment and assuring the availability of the current terminal process have been analysed thermo-economically with acceptable results.…”
Section: Introductionmentioning
confidence: 99%
“…[13,14] the proposed combined system consists of the Rankine cycle with ammoniaewater mixture as working fluids [15]; presents a novel power plant consisting of a combination of a closed Brayton cycle with a steam Rankine cycle, arranged in series, while in Ref. [16] a combined cycle using a gas turbine and a pure NH 3 Rankine cycle coupled with the natural gas vaporization process has been chosen as the most advisable one to be installed. Different thermodynamic systems like those based on Stirling cycle and Kalina cycle have been proposed, but in general those can be considered only preliminary studies and non-commercial solutions, as argued in Refs.…”
Section: Introductionmentioning
confidence: 99%