1992
DOI: 10.1061/(asce)0733-9364(1992)118:4(731)
|View full text |Cite
|
Sign up to set email alerts
|

Automation of Concrete Slab‐on‐Grade Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

1994
1994
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 4 publications
0
3
0
Order By: Relevance
“…A comprehensive productivity analysis of the concrete slab-on-grade construction has been described in an earlier study (Moselhi et al 1992) and will be briefly summarized here for continuity. The data collected from the 15 sites was used to model concrete placing productivity, defined as the number of man-hours required to place one cubic meter of concrete, for a 150mm (6 in.)…”
Section: Productivity Analysismentioning
confidence: 99%
See 2 more Smart Citations
“…A comprehensive productivity analysis of the concrete slab-on-grade construction has been described in an earlier study (Moselhi et al 1992) and will be briefly summarized here for continuity. The data collected from the 15 sites was used to model concrete placing productivity, defined as the number of man-hours required to place one cubic meter of concrete, for a 150mm (6 in.)…”
Section: Productivity Analysismentioning
confidence: 99%
“…machine. Comparatively, the reported productivity of floor finishing robots (Moselhi et al 1992) varies from 300 to 800 m2/hr (3,228 to 8,608 ft2/hr).…”
Section: Productivity Analysismentioning
confidence: 99%
See 1 more Smart Citation