Automated Selection and Localization of Mobile Cranes in Construction Planning

Abstract: Accurate selection and location of mobile cranes is a critical issue on construction sites, being able to contribute to the improvement of the safety and efficiency of lifting operations. Considering the complexities and dynamics of construction sites, this study aimed to develop a useful approach for automated selection and localization of mobile cranes based on the simulation of crane operations. First, the information required for crane selection and localization is analyzed and extracted from BIM (building… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
12
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(12 citation statements)
references
References 41 publications
0
12
0
Order By: Relevance
“…Metal roofing panels, flashing, insulation, and other components are carefully arranged and prepared for effective installation. Effective coordination among the crane operator, roofing contractors, and other personnel is crucial to optimise workflow and reduce downtime [14].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Metal roofing panels, flashing, insulation, and other components are carefully arranged and prepared for effective installation. Effective coordination among the crane operator, roofing contractors, and other personnel is crucial to optimise workflow and reduce downtime [14].…”
Section: Introductionmentioning
confidence: 99%
“…In previous studies by [14], managers often grapple with optimising project implementation while considering time, cost, and quality objectives. To address this, the balancing method, a prevalent approach, is employed to harmonise these three facets effectively.…”
Section: Introductionmentioning
confidence: 99%
“…In the past decades, the selection of cranes and their location on the job site is often made manually and largely dependent on the design of the building. This method, manual planning through trial and error based on the site shape, is inefficient and error-prone in today's construction projects, where projects become more and more complex [1,5,6].…”
Section: Introductionmentioning
confidence: 99%
“…(2) optimum crane location; (3) crane path planning; (4) the usage and coordination of multiple cranes; and (5) simulation and visualization of crane operation [5][6][7][8][9].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation