2021
DOI: 10.1016/j.buildenv.2020.107544
|View full text |Cite
|
Sign up to set email alerts
|

Approach to manage parameter and choice uncertainty in life cycle optimisation of building design: Case study of optimal insulation thickness

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 25 publications
0
3
0
Order By: Relevance
“…The calculation of the carbon emissions of the whole building process is the research focus of the low-carbon building evaluation system. At present, the process analysis method [23] is a common method for carbon emission chemical analysis in the international community. This method splits the production process according to the process flow; it uses the product of the measured carbon emission coefficient and the corresponding carbon emission source activity data to express the carbon emissions generated by each process and then calculates the total carbon emissions of the whole process according to the carbon emissions of each process.…”
Section: Methods To Determine Carbon Emissions Of Roof Insulationmentioning
confidence: 99%
“…The calculation of the carbon emissions of the whole building process is the research focus of the low-carbon building evaluation system. At present, the process analysis method [23] is a common method for carbon emission chemical analysis in the international community. This method splits the production process according to the process flow; it uses the product of the measured carbon emission coefficient and the corresponding carbon emission source activity data to express the carbon emissions generated by each process and then calculates the total carbon emissions of the whole process according to the carbon emissions of each process.…”
Section: Methods To Determine Carbon Emissions Of Roof Insulationmentioning
confidence: 99%
“…Since the individual eco-indicators of the LCA (GWP, AP, PENRT and PERT) have different significance on the overall ecological building performance, they are weighted with significance factors to determine one weighted LCA environmental impact value according to the DGNB system [54]. It is difficult to find single optimal solutions in multi-criteria optimization studies when not assigning weights to the evaluation objectives [55]. Therefore, the framework allows the decision maker to assign relative weightings to the performance factors, enabling the design team to give preferences in the design search.…”
Section: Grading System For Performance Comparison Of Different Build...mentioning
confidence: 99%
“…In the last decade, MOEAs were widely applied in the building industry to solve MOO problems, which often include objectives such as operational energy performance [9][10][11], thermal comfort [9,10,12], daylight conditions [13,14], life cycle assessment (LCA) [11,[15][16][17][18][19] and life cycle cost (LCC) [10,[17][18][19]. This directly indicates the benefit of investigating MOO problems in the praxis of the building industry.…”
Section: Introductionmentioning
confidence: 99%