2019
DOI: 10.1007/978-3-030-19868-8_13
|View full text |Cite
|
Sign up to set email alerts
|

Application of the PERT Method in Scheduling of Construction of Apart-Hotel for Energy Consumption Economy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
18
0

Year Published

2019
2019
2020
2020

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 15 publications
(18 citation statements)
references
References 4 publications
0
18
0
Order By: Relevance
“…However, with all the existing barriers, there is an important incentive for the development of renewable energy sources -environmental stabilization and reducing the dependence of economies on energy import conditions, respectively, creating conditions for the energy security of each country's energy supply [2][3][4][5].…”
Section: Resultsmentioning
confidence: 99%
“…However, with all the existing barriers, there is an important incentive for the development of renewable energy sources -environmental stabilization and reducing the dependence of economies on energy import conditions, respectively, creating conditions for the energy security of each country's energy supply [2][3][4][5].…”
Section: Resultsmentioning
confidence: 99%
“…(3) b) the project scenario, when the creation of a farm energy supply complex, consisting of a installation for the production of biogas from animal waste for heating and gas use in electricity-generating gas generators. Using this complex will allow the farm to switch to an autonomous energy supply system, save electricity, coal and wood fuel Emission reduction is calculated on the basis of the generated thermal energy when burning a certain amount of biogas [7] BS , -heat energy consumption due to biogas burning generated by unit k in year y (mass or volume, dry basis) was adopted in projects regarding the bioreactor volume 0.13 Nm 3 / (m 3 accepted according to the methods [8] in 10% of the maximum amount of methane that this system can produce.…”
Section: Rvs Rvs mentioning
confidence: 99%
“…Modern efficient economy requires to valuate various types of products (works) as costs of life cycle contracts (LCC) [7], the maximum initial cost of LCC and the cost of ownership [8], including for capital construction projects. Despite their complexity, the problem of cost modeling of life cycles of construction of a building in terms of total costs, as well as valuation of cost of life cycle contracts for real estate, are actively explored by researchers [9].…”
Section: Introductionmentioning
confidence: 99%