2022
DOI: 10.3390/su14042283
|View full text |Cite
|
Sign up to set email alerts
|

Application of openBIM for the Management of Existing Railway Infrastructure: Case Study of the Cancello–Benevento Railway Line

Abstract: In the field of infrastructure, the development and application of the openBIM (open Building Information Modeling) approach and related standards (principally Industry Foundation Classes) remain limited with regard to processes in O&M (Operation and Maintenance) phases, as well as the broader context of AM (Asset Management). This article deals with the activities carried out as part of a pilot project based on the need to manage the operation and assess the condition and value of existing infrastructure … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 12 publications
(12 citation statements)
references
References 28 publications
(30 reference statements)
0
8
0
Order By: Relevance
“…In several countries such as Italy, UK, Spain, and China, building information modeling (BIM) is implemented in railway infrastructure maintenance digital transformation [46][47][48][49][50][51]. Its implementation can improve the railway infrastructure maintenance planning with time saving, cost optimization [46], [47][48][49][50][51][52], and provide the internal requirement in terms of the safety of the users [52]. Building information modeling (BIM) facilitates all stakeholders, so they can keep the maintenance project scope in review if there is any changes [50].…”
Section: E-maintenance Implementation Trends In Railway Infrastructurementioning
confidence: 99%
“…In several countries such as Italy, UK, Spain, and China, building information modeling (BIM) is implemented in railway infrastructure maintenance digital transformation [46][47][48][49][50][51]. Its implementation can improve the railway infrastructure maintenance planning with time saving, cost optimization [46], [47][48][49][50][51][52], and provide the internal requirement in terms of the safety of the users [52]. Building information modeling (BIM) facilitates all stakeholders, so they can keep the maintenance project scope in review if there is any changes [50].…”
Section: E-maintenance Implementation Trends In Railway Infrastructurementioning
confidence: 99%
“…The central element is the LOD (Level of Detail) in the BIM model, which represents the risk object (e.g., a switch) with all geometric and non-geometric information. The main objective of the project in [43] was to systematize the information of the digitized railway infrastructure in order to assess possible performance gaps within the national infrastructure. The project proposed a digitization strategy to define surveying activities and implement openBIM systems to develop an object library and a federated digital asset management model.…”
Section: Bim In Railway Transportmentioning
confidence: 99%
“…Part of the research focused on the use and expansion of the IFC standard to include the description of railways, which certainly favored and supported the development of the IFC 4.3 standard, which can now also describe railway objects [232][233][234]. An interesting example of applying Open BIM to asset management can be found in the work of Ciccone et al [235]. The authors had the main goal of systematizing information by digitalizing the infrastructure of the Cancello-Benevento railway line in Italy in order to assess possible performance gaps within the national railway standards.…”
Section: Railwaysmentioning
confidence: 99%