Analysis on the Structural Safety of the Tower Crane under Load

Abstract: In this study, the deformation analysis is done at tower crane by applying the load at the end of jib and the moment at mast. The greatest stain and stress are happened at the end of wire supporting jib. The great deformation takes place at the end of jib applied by stress and there is no deformation at the lower part of mast. As the life becomes smallest at the upper part of mast, this part becomes weakest. The safety design and durability can be improved by applying the result of structural safety analysis a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…For example, when a tower crane with a lifting capacity of 8 tons lifts 8 tons of material at the end of the working radius, it lifts materials above the rated load. If the overload continues, it causes fatigue fracture and collapse of the tower crane [12].…”
Section: Introductionmentioning
confidence: 99%
“…For example, when a tower crane with a lifting capacity of 8 tons lifts 8 tons of material at the end of the working radius, it lifts materials above the rated load. If the overload continues, it causes fatigue fracture and collapse of the tower crane [12].…”
Section: Introductionmentioning
confidence: 99%