2022
DOI: 10.36055/fondasi.v0i0.14402
|View full text |Cite
|
Sign up to set email alerts
|

Analisis Sedimentasi di Tampungan Embung Daerah Irigasi Jurug Lendah Kulon Progo

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Based on the following description, management efforts are needed at the Tambakboyo Reservoir to reduce the possibility of environmental impacts occurring. [14,15] provided several recommendations for sediment handling, including repairing open land (greening), dredging sediments in the reservoir, and building a sediment trap upstream of the reservoir. In addition, to protect the body of the reservoir against fluctuations in the water level, rocks that are resistant to weathering (rip-rap) are installed on the upstream slope of the dam.…”
Section: Resultsmentioning
confidence: 99%
“…Based on the following description, management efforts are needed at the Tambakboyo Reservoir to reduce the possibility of environmental impacts occurring. [14,15] provided several recommendations for sediment handling, including repairing open land (greening), dredging sediments in the reservoir, and building a sediment trap upstream of the reservoir. In addition, to protect the body of the reservoir against fluctuations in the water level, rocks that are resistant to weathering (rip-rap) are installed on the upstream slope of the dam.…”
Section: Resultsmentioning
confidence: 99%
“…Sedimen tersebut akan diendapkan pada suatu tempat yang kecepatan airnya lambat atau berhenti, proses inilah yang dinamakan sedimentasi [2]. Dampak dari sedimentasi pada tampungan seperti embung mengakibatkan kapasitas tampungnya berkurang, serta intake saluran irigasi dapat terhambat akibat endapan sedimen tersebut [3]. Kinerja bangunan kantong lumpur dipengaruhi oleh karakter ukuran sedimen yang masuk, debit, dan dimensi bangunan kantong lumpur itu sendiri.…”
Section: Pendahuluanunclassified
“…With these conditions, the potential for sediment accumulation at the bottom of the reservoir is compounded by the chaotic condition of several reservoir discharge gates because they have never been operated since they were built until now. This causes quite large sedimentation to occur in the reservoir, so that the storage capacity becomes smaller [4,5]. Apart from that, another impact is the potential for flooding due to reduced water holding capacity and eutrophication [6].…”
Section: Introductionmentioning
confidence: 99%