Analisis Pemeliharaan Mesin Blowmould Dengan Metode RCM Di PT. CCAI

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
4

Year Published

2018
2018
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 18 publications
(13 citation statements)
references
References 0 publications
0
4
0
4
Order By: Relevance
“…Pemilihan sistem dalam RCM berdasarkan pada sistem yang mempunyai risiko tinggi terhadap keselamatan atau lingkungan, system yang mempunyai biaya preventive atau corrective yang besar serta sistem yang berdampak besar terjadinya shutdown. Pengumpulan informasi mempunyai tujuan untuk mendapatkan informasi yang mendalam tentang system dan cara kerja peralatan [12]. B. Definisi batasan sistem.…”
Section: Metodeunclassified
“…Pemilihan sistem dalam RCM berdasarkan pada sistem yang mempunyai risiko tinggi terhadap keselamatan atau lingkungan, system yang mempunyai biaya preventive atau corrective yang besar serta sistem yang berdampak besar terjadinya shutdown. Pengumpulan informasi mempunyai tujuan untuk mendapatkan informasi yang mendalam tentang system dan cara kerja peralatan [12]. B. Definisi batasan sistem.…”
Section: Metodeunclassified
“…Failure Mode Effect Analysis (FMEA) evaluates failures that occur in a system, design, process, or service (Ahmadi & Hidayah, 2017). FMEA also aims to analyze failure modes in a system so that it can be used to determine or decide on actions to prevent and fix them (Denur et al, 2017).…”
Section: Failure Mode and Effect Analysis (Fmea)mentioning
confidence: 99%
“…The decision to replace system components based on the minimum breakdown is critical because maintenance management's main principle is to suppress the period of damage to the minimum (Ahmadi & Hidayah, 2017). Preventive maintenance aims to determine the optimal maintenance time interval so that the machine reliability can be maintained and the machine can be appropriately operated before the upcoming maintenance schedule.…”
Section: Preventive Maintenance Time Intervalsmentioning
confidence: 99%
“…Tingkat kepentingan terhadap kualitas perawatan dan reparasi kapal yang paling berpengaruh berturut-turut adalah pekerjaan penggantian pelat pada lantai car deck dan ruang bawah car deck, pekerjaan penggantian pondasi, pekerjaan replating pada bagian lambung kapal, kemudian pekerjaan pada cleaning tangki serta pekerjaan pada as propeller, lalu pekerjaan penggantian sekat dan pekerjaan penggantian beam pada kapal. (Hidayah and Ahmadi, 2017). Standar perawatan kapal terdiri atas 4 yaitu: 1) Standar perawatan/ pemeliharaan bagian dek.…”
Section: Perawatan Kapalunclassified