2013
DOI: 10.1057/jors.2013.30
|View full text |Cite
|
Sign up to set email alerts
|

An optimization-based model for maximizing the benefits of fast-track construction activities

Abstract: Fast-track construction projects have become more popular in recent years in response to growing industry demand. By allowing downstream construction activities to start with incomplete information from upstream design activities, fast-tracking (through overlapping) allows for shorter project duration at the expense of potential rework. This leaves practitioners with the challenge of determining the optimal fast-tracking strategy to meet project schedule requirements while avoiding excessive amounts of rework.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0
2

Year Published

2014
2014
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 27 publications
(24 citation statements)
references
References 32 publications
0
14
0
2
Order By: Relevance
“…The literature discussing the implications of overlapping and rework in product development and construction projects is plentiful [26]. Recently, Dehghan and Ruwnapura [27] and Dehghan et al [20] presented a thorough review of the current and previous fasttracking models for both product development and project design and execution.…”
Section: 1literature Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…The literature discussing the implications of overlapping and rework in product development and construction projects is plentiful [26]. Recently, Dehghan and Ruwnapura [27] and Dehghan et al [20] presented a thorough review of the current and previous fasttracking models for both product development and project design and execution.…”
Section: 1literature Reviewmentioning
confidence: 99%
“…In 2012 and 2013, Khoueiry et al [26,37] developed another optimisation model for fast-tracking construction activities by calculating the probability of rework and its impact.…”
Section: Gwak Et Al (2016) [39]mentioning
confidence: 99%
See 3 more Smart Citations