2009
DOI: 10.1002/etep.334
|View full text |Cite
|
Sign up to set email alerts
|

An oligopolistic model considering the locational SR requirement for joint energy‐reserve market

Abstract: To ensure the delivery of spinning reserve (SR) under predicted contingency conditions, zone-based SR procurement mechanism should be taken into account in practice. An oligopolistic model considering locational SR requirement in joint energy and SR market is proposed in this paper. Every pre-defined SR zone has its own SR requirement, and the relevant SR could be procured not only from the locational generators, but also from the generation resources outside this locational SR area via the tie line interface.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
11
0

Year Published

2011
2011
2016
2016

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(12 citation statements)
references
References 28 publications
0
11
0
Order By: Relevance
“…For simplicity, the majority of works deal with a unique reserve product. Some authors do not explicit the type of reserve considered (see [41][42][43][44][45][46][47][48][49]), whereas others refer to spinning reserve (see [14,[37][38][39][50][51][52][53][54][55][56][57][58][59][60][61][62][63]).…”
Section: Type Of Reservesmentioning
confidence: 99%
“…For simplicity, the majority of works deal with a unique reserve product. Some authors do not explicit the type of reserve considered (see [41][42][43][44][45][46][47][48][49]), whereas others refer to spinning reserve (see [14,[37][38][39][50][51][52][53][54][55][56][57][58][59][60][61][62][63]).…”
Section: Type Of Reservesmentioning
confidence: 99%
“…In deterministic approaches [2][3][4][5][6], the SR capacity is often predefined and equal to a specific percentage of the hourly system loads, or capacity of the largest online generator. Prior to clearing, the required SR determination is of great importance and can affect significantly the energy and SR markets scheduling.…”
Section: Introductionmentioning
confidence: 99%
“…Prior to clearing, the required SR determination is of great importance and can affect significantly the energy and SR markets scheduling. In [2][3][4][5][6][7], the ISO merely minimizes the SR procurement cost to meet the predefined SR capacity using the available SR resources. In deterministic approaches [2][3][4][5][6], the SR capacity is often predefined and equal to a specific percentage of the hourly system loads, or capacity of the largest online generator.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations