2020
DOI: 10.1016/j.ijpe.2019.05.017
|View full text |Cite
|
Sign up to set email alerts
|

An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
21
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 89 publications
(21 citation statements)
references
References 29 publications
0
21
0
Order By: Relevance
“…A Hybrid Particle Swarm Optimization (H-PSO) was described for IPPS and delivery route planning. This was implemented utilizing multi-purpose machines to minimize the cost and earliness and tardiness of the jobs [26]. A logic-based Benders decomposition (LBBD) algorithm mainly separates the decision variables into two sub-categories, i.e., master problem deals with the process plan and sub-problem deals with the sequencing has been emphasized that can solve the IPPS problem for finding an exact solution [27].…”
Section: Literature Reviewmentioning
confidence: 99%
“…A Hybrid Particle Swarm Optimization (H-PSO) was described for IPPS and delivery route planning. This was implemented utilizing multi-purpose machines to minimize the cost and earliness and tardiness of the jobs [26]. A logic-based Benders decomposition (LBBD) algorithm mainly separates the decision variables into two sub-categories, i.e., master problem deals with the process plan and sub-problem deals with the sequencing has been emphasized that can solve the IPPS problem for finding an exact solution [27].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Mohammadi et al [25] studied an integrated flexible job-shop scheduling-vehicle routing problem with a time window. They modelled the problem as a novel biobjective mixed integer, in which the first objective function tries to minimize a sum of the production and distribution scheduling costs, and the second objective function aims to minimize a weighted sum of delivery earliness and tardiness.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They considered a furniture manufacturing company producing customized goods as a case study. In this study, an Ɛ-constraint method is applied to solve small-sized real data and medium-and large-sized problems are solved by a Hybrid Particle Swarm Optimization algorithm [25].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Studies of scheduling and vehicle routing problems with time windows were initiated by Schrage [30] and Bodin et al [5]. Recent publications include Sarasola and Doerner [29], Gnegel and Fügenschuh [15], Mohammadi et al [25], Chen et al [8] and Lera-Romero et al [23], among others.…”
Section: Problemmentioning
confidence: 99%