2015
DOI: 10.17531/ein.2015.1.10
|View full text |Cite
|
Sign up to set email alerts
|

An integrated model of production scheduling and maintenance planning under imperfect preventive maintenance

Abstract: Chen X, XiAo L, ZhAng X, XiAo W, Li J. An integrated model of production scheduling and maintenance planning under imperfect preventive maintenance. eksploatacja i niezawodnosc -Maintenance and Reliability 2015; 17 (1): 70-79.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
18
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 17 publications
(18 citation statements)
references
References 28 publications
0
18
0
Order By: Relevance
“…However, only single selection mechanism (clone selection or the best keeping) 19 is conducted in most AIS and thus cannot maximize the usage of information in the iteration process results in limiting convergence speed. For this reason, we improve the ICSA 4 (one of AIS) based on CA 27 and design the AICS-CA to meet the timeliness requirement in our present research. In AICS-CA, there are two main aspects: (a) the feasible solutions set (population space) should be divided into certain amount of subpopulations according to evolution direction, and (b) corresponding selection strategies are determined relying on the evolution of these subpopulations.…”
Section: Optimization Methodologymentioning
confidence: 99%
See 4 more Smart Citations
“…However, only single selection mechanism (clone selection or the best keeping) 19 is conducted in most AIS and thus cannot maximize the usage of information in the iteration process results in limiting convergence speed. For this reason, we improve the ICSA 4 (one of AIS) based on CA 27 and design the AICS-CA to meet the timeliness requirement in our present research. In AICS-CA, there are two main aspects: (a) the feasible solutions set (population space) should be divided into certain amount of subpopulations according to evolution direction, and (b) corresponding selection strategies are determined relying on the evolution of these subpopulations.…”
Section: Optimization Methodologymentioning
confidence: 99%
“…Processing time of each job on each machine, and the cost and time of imperfect PM at system-level. 4 Machine Required processing time (h) Imperfect M1 25 17 41 74 37 72 11 31 32 27 2 180 4 2000 M2 15 41 155 12 95 34 77 39 92 114 5 230 6 4000 M3 12 22 83 24 72 62 31 141 42 21 4 170 5 3600 M4 40 36 121 48 52 32 26 56 74 90 3 200 5 2700 M5 60 58 160 78 153 162 32 79 102 52 5 500 7 2000 PM: preventive maintenance.…”
Section: Case Studymentioning
confidence: 99%
See 3 more Smart Citations