2014
DOI: 10.1080/00207543.2013.878055
|View full text |Cite
|
Sign up to set email alerts
|

An integer linear programming model to support customer-driven material planning in synchronised, multi-tier supply chains

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0
2

Year Published

2017
2017
2021
2021

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(7 citation statements)
references
References 33 publications
0
5
0
2
Order By: Relevance
“…en, the first-tier supplier obtains its demand by using a simple bill-of-materials parts explosion, given the OEM demand plan. e second-tier supplier estimates the component requirements from the final requirements in a frozen sequence transferred by the first-tier supplier, and the demand plan is generated [18]. en, the second-tier supplier proceeds to compute the LSSP model with the aim of (i) assigning molds to machines; (ii) scheduling the processing molds in machines during each planning time period; and (iii) calculating the optimal lot size of products.…”
Section: Problem Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…en, the first-tier supplier obtains its demand by using a simple bill-of-materials parts explosion, given the OEM demand plan. e second-tier supplier estimates the component requirements from the final requirements in a frozen sequence transferred by the first-tier supplier, and the demand plan is generated [18]. en, the second-tier supplier proceeds to compute the LSSP model with the aim of (i) assigning molds to machines; (ii) scheduling the processing molds in machines during each planning time period; and (iii) calculating the optimal lot size of products.…”
Section: Problem Descriptionmentioning
confidence: 99%
“…Constraint (31) indicates the binary nature of the setup S iljt and setup amount SA iljt variables. Finally, the MILP model for lot sizing and scheduling on parallel flexible injection machines with setup common operators is also subject to constraints (6), ( 8), (13a), (13b), ( 14)-( 16), (18), and (19). e performance of the proposed model was evaluated on a set of instances that reflect different characteristics of the real-world case of the automotive components industry under study.…”
Section: Bound and Nature Variablesmentioning
confidence: 99%
“…Similarly, the supply chains in transport framework also have been broadly discussed. For instance, Mula et al [1] presented a review of mathematical programming models for supply chain production and transport planning. Xie et al [2] developed a multistage, mixed inter programming model to fully integrate multimodal transport into the cellulosic biofuel supply chain design under feedstock seasonality.…”
Section: Introductionmentioning
confidence: 99%
“…Developed mathematical models enable optimization of all supply chain resources, including subcontractors realizing delivery orders in a multi-level structure [23,24]. High applicability of ILP problem is furthermore confirmed by the results of a study devoted to scheduling in a river transportation system model [25]. Moreover, ILP problem is also used in the development of sequential algorithms carrying out packaging optimization tasks [26].…”
Section: Introductionmentioning
confidence: 88%