1995
DOI: 10.1016/0926-5805(94)00029-m
|View full text |Cite
|
Sign up to set email alerts
|

An information engineering approach to modelling building design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2008
2008
2020
2020

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 17 publications
(13 citation statements)
references
References 10 publications
0
12
0
Order By: Relevance
“…These models characterize geometry, properties, links, and attributes of the real objects [3]. It is assumed that a building consists of elements and parts different by their functions, properties, and manufacture technology [4]. A part may involve a simple structural component or a complex structure.…”
Section: Bim a New Approach Of The Design And Managementmentioning
confidence: 99%
See 3 more Smart Citations
“…These models characterize geometry, properties, links, and attributes of the real objects [3]. It is assumed that a building consists of elements and parts different by their functions, properties, and manufacture technology [4]. A part may involve a simple structural component or a complex structure.…”
Section: Bim a New Approach Of The Design And Managementmentioning
confidence: 99%
“…The constant mutual collaboration between the project's participants is the main obligation to ensure the effective management of construction project [3], [4], [17], [18] and it can be fulfilled by using 5D (five dimensional) modeling concept [8], [11], [19].…”
Section: D Modeling and Analysismentioning
confidence: 99%
See 2 more Smart Citations
“…In this part of article five tables are presented with description of uncertainty sources [5,[10][11][12][13][14] and possible consequences. Sources and consequences are combined in five groups to clarify the type of uncertainty source: − ununified communication [5,12] and undefined "Project language" (see Table 1); − low qualification and professional training [15] of employees (see Table 2); − unestimated work amounts [16] in project's estimate and unacceptable planning of works [17,18] (see Table 3); − the lack of management tools [19][20][21][22] and ineffective-irrational organization of works on site [23,24] (see Table 4); − unclear responsibility limits [23] and no strict contractual obligations [14] (see Table 5). c) the lack of contractor experience (no experience in similar construction project, lack of professional knowledge, the deficiency of adequate project management) can lead to delay of time for project implementation, grow the expenses.…”
Section: Sources Of Uncertaintymentioning
confidence: 99%