2018
DOI: 10.1016/j.jmsy.2018.04.016
|View full text |Cite
|
Sign up to set email alerts
|

An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
22
0
1

Year Published

2019
2019
2024
2024

Publication Types

Select...
9
1

Relationship

5
5

Authors

Journals

citations
Cited by 50 publications
(25 citation statements)
references
References 28 publications
0
22
0
1
Order By: Relevance
“…A just-in-time production process for an integrated model was developed by Das Roy et al [40]. Recently, Kim et al [41] proposed an integrated model with backorders, where they used an improved technique to calculate imperfect items when a process has gone through a long-run process.…”
Section: Introductionmentioning
confidence: 99%
“…A just-in-time production process for an integrated model was developed by Das Roy et al [40]. Recently, Kim et al [41] proposed an integrated model with backorders, where they used an improved technique to calculate imperfect items when a process has gone through a long-run process.…”
Section: Introductionmentioning
confidence: 99%
“…Recently, Sharma [34] conducted a survey on inventory models with inflation and Sarkar [31] introduced a three-stage inspection with some shelf-life products. Kim et al [15] developed a production model under a random controllable lead time.…”
Section: Inflation Imperfect Quality Items Inspection Plansmentioning
confidence: 99%
“…An improved way to calculate imperfect items is given by Kim et al [56], and Sett et al [57] determined optimal buffer inventory in imperfect production system. Sarkar et al [58] studied warranty, optimal run time with inspection errors in the imperfect production system, and Kang et al [59] discussed optimal ordering policies for the imperfect production system.…”
Section: Literature Reviewmentioning
confidence: 99%