2021
DOI: 10.1007/978-3-030-80946-1_92
|View full text |Cite
|
Sign up to set email alerts
|

Algorithm for Scheduling Construction and Installation Work Using Bulk Construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 18 publications
0
2
0
Order By: Relevance
“…The average values of these estimates are given in Table . 1 for the case of four and five criteria with three and four gradations according to their scales and two, three and four classes of solutions [13]. The given data show that the proposed procedure requires the presentation of no more than 2.8 times more vector estimates than the reference algorithm.…”
Section: Determination Of a mentioning
confidence: 86%
“…The average values of these estimates are given in Table . 1 for the case of four and five criteria with three and four gradations according to their scales and two, three and four classes of solutions [13]. The given data show that the proposed procedure requires the presentation of no more than 2.8 times more vector estimates than the reference algorithm.…”
Section: Determination Of a mentioning
confidence: 86%
“…The day of the week factor is fixed with . The variable reflects the effect of time of day [6]. Since moviegoers tend to have more free time for leisure activities, such as going to the cinema during holidays or school holidays, we expect all of these parameters to be positive.…”
Section: Model and Methodsmentioning
confidence: 99%